Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Download Method Statement for Installation of False Ceiling System

Download Method Statement for Installation Of False Ceiling System (Gypsum Boards, Panels Etc)  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the […]

Download Method Statement for Installation of False Ceiling System Read More »

Method Statement for Civil Works
chiller testing method statement

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF CHILLERS

Below is detailed method statement for testing and commissioning of chiller. All the testing and commissioning work shall be done in accordance with mechanical specification and in accordance with the manufacturer’s instructions. Prior to starting the Chiller all electrical works related to supply of power to the equipment should be tested and energized. Furthermore, chemical

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF CHILLERS Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

Download Method Statement for Testing & Commissioning of Fan Coil Units FCU’s

Complete HVAC Installation, Testing & Commissioning Package with ITP, QA/QC Checklists & Risk Assessment Download a professionally prepared Fan Coil Units (FCUs) T&C Method Statement package developed for HVAC contractors, MEP companies, commissioning engineers, QA/QC professionals, consultants, and construction teams involved in residential, commercial, healthcare, hospitality, and infrastructure projects. This editable document package provides complete

Download Method Statement for Testing & Commissioning of Fan Coil Units FCU’s Read More »

HVAC Method Statements, Testing & Commissioning

Download Method Statement For Testing & Commissioning of MV Power Cables

Now you can Download Method Statement, ITP, Checklists and Risk Assessment For MV Cables Testing & Commissioning Method statement is covering pre-commissioning & commissioning of MV Cables & Accessories. which can be downloaded immediately. The files are in word/excel format and You only need to change project name and insert logos etc and the same

Download Method Statement For Testing & Commissioning of MV Power Cables Read More »

Electrical Method Statements, Testing & Commissioning

Download Method Statement For Testing & Commissioning Vacuum System

 Download Package Contains the Method Statement + Checklist for Pre Commissioning + Checklist for Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included

Download Method Statement For Testing & Commissioning Vacuum System Read More »

Plumbing Method Statements, Testing & Commissioning

Vacuum System Testing & Commissioning Procedure

This method statement covers all processes related to the testing and commissioning of laboratory or hospital vacuum system. Implementation of this method statement requires reference to other relevant documents like inspection and testing plan outlining the responsibility and the quality verification to be performed by various parties. Other references include: Tools & Equipment Below is

Vacuum System Testing & Commissioning Procedure Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning
SMDB MDB FDB Specifications

MDB, SMDB, DB, MCC & Capacitor Bank Installation Method Statement

The purpose of generating this method statement is to implement the correct practices for the installation of main distribution board MDB, Sub main distribution boar SMDB, distribution board DB, Motor Control Center MCC and capacitor bank. By following the guidelines contained herein the installation team shall ensure that the job execution complies with project specifications

MDB, SMDB, DB, MCC & Capacitor Bank Installation Method Statement Read More »