This method statement covers the supply, handling, installation, inspection, identification, and pre-commissioning verification of HVAC dampers associated with air distribution, ventilation, smoke management, and life safety systems.
The works include installation of dampers in ductwork, walls, shafts, floors, ceilings, and mechanical rooms together with actuators, access panels, sleeves, supports, and control interfaces.
Download package contains:
- Method Statement
- Checklist for Installation
- Inspection & Testing Plan
- Risk Assessment
You only need to change project name, insert logos and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.

Download Method Statement with Checklists, ITP & Risk Assessment
