Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

This plumbing method statement covers the nature and type of work for drainage outlets stainless steel shower gullies for the project as per site requirements. Method statement also covers frequency of which inspections are to be carried out. All documentary requirements for the installation works will be submitted for approval of consultant and this will […]

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements
Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

The objective of this method statement is to set down the procedures that are involved in the safe erection, operation and dismantling of a slip form shuttering, applicable for the construction of core for the project building. Roles and Responsibilities Project manager has overall responsibility for the implementation of this method statement and to ensure

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Project Planning
Water Leak Detection System Installation Method Statement

Water Leak Detection System Installation Method of Statement

This “Method Statement” covers the nature and type of work for Water Leak Detection System installation as per approved material submittal and project specifications and legal requirements. MEP project manager have full authority and overall responsibility to manage, supervise, control the works and have direct responsibility for ensuring safe working practices and compliance with regulatory

Water Leak Detection System Installation Method of Statement Read More »

Construction Method Statements, Electrical Method Statements, Plumbing Method Statements
Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Most accidents from roofs could have been prevented by the identification of hazards and by the provision and proper use of readily available equipment. As a high risk activity, it is important that all roof work is pre planned. Falls and falls of materials are the major cause of injury; therefore a safe system of

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control Read More »

Civil Engineering Methods, Construction Method Statements, Occupational Health and Safety, Risk Assessment
Process Pipe Pneumatic Testing Manifold Connection Diagram

Method of Statement for Pneumatic Testing of Distribution and Process Piping System

The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management Team, hydro/pneumatic pressure testing engineer and all personnel working on site. Below is

Method of Statement for Pneumatic Testing of Distribution and Process Piping System Read More »

Plumbing Method Statements, Pressure Testing, Stainless Steel Fabrication, Testing & Commissioning

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to meet the requirements of applicable codes and client’s project specifications for pipe fabrication

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing Read More »

Method Statements, Piping Method Statements, Pressure Testing, Stainless Steel Fabrication, Templates, Test Reports & Forms
Scroll to Top