Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Inspection and Test Requirements for In-Situ Concrete Placement

Inspection and Test Requirements for In-Situ Concrete Placement

This procedure covers checks and quality control requirements for carrying out in-situ concrete operations. Daily concrete requirements shall be provided to the RMC supplier including quantity, mix  details, workability time, delivery rate and access arrangements. Site Engineer shall ensure that checks on the following activities take place using checklist for In-Situ Reinforced Concrete. Formwork Requirements […]

Inspection and Test Requirements for In-Situ Concrete Placement Read More »

Civil Engineering Methods, Construction Method Statements, Quality Management
Steel Bar Rebar Reinforcement Cutting and Bending Procedure

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the specific project contract documentation. In any circumstances where specifications are not provided or

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating manual and cartridge operating manual. Hazard Identification and Risk Assessment The introduction of

Explosive Power Tools Operation Safety Instructions Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Technical Articles
Excavation Work Guidelines for Irrigation and Water Supply Projects

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is responsible in ensuring the implementation of construction procedure and method statement, supervising the

Excavation Work Guidelines for Irrigation and Water Supply Projects Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works

Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall ensure that the water stop works are carried out in accordance with company

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Concrete Bulging Repair Method Statement

Concrete Bulging Repair Method Statement

This civil method statement details general procedures to be followed for repairing work of concrete bulging elements by using a suitable material i.e. BASF’s Emaco S88C T. The method covers preparatory works, bulging repairs and curing. The scope of this civil work method statement is for rectification of the bulges in concrete in which chipping

Concrete Bulging Repair Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Method Statement for Installation of Fire Stop Work

Fire Stop Work Installation & Application Method Statement

Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References:  Approved Project Quality Plan Approved Project HSE Plan Approved Material Management Plan Material approval for Fire stop work Technical Literature

Fire Stop Work Installation & Application Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Fire Suppression System, Method Statement for Civil Works