Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Sequence Of Operation For Electrical, Low Current & ELV Systems

Fire Alarm Panels Sequence Location: Fire Alarm Panels: Various Locations (refer to Fire Alarm Layout) Each Fire alarm panel will be monitored by the DDC controller to provide a system healthy, fault and alarm. All information shall be displayed on the BMS Supervisor. All MCC and DDC control panels will be linked to the Fire Alarm […]

Sequence Of Operation For Electrical, Low Current & ELV Systems Read More »

Building Management System, Construction Method Statements, Electrical Method Statements
SOA of AHU

Sequence Of Operation For Variable Volume Type Fresh Air Handling Units

Sequence of operation is very important part of testing and commissioning of equipment’s. This becomes more important when matter of mechanical systems is considered. SOA is technical document that is developed based upon the mechanical systems performance and operation requirements. Sequence of operation is part of building management system BMS submission documents. BMS covers the

Sequence Of Operation For Variable Volume Type Fresh Air Handling Units Read More »

HVAC Method Statements, Testing & Commissioning

Sequence of Installation for the Chiller Plant Manager CPM Field Devices

Sequence of Installation for the Chiller Plant Manager Field Devices Safety All site safety rules & regulations shall be complied with. Supervisors will deliver tool box talks, relevant to these activities to all operatives involved in the installation and shall be recorded. All operatives will be equipped with minimum personnel protective equipment; hard hat, coveralls,

Sequence of Installation for the Chiller Plant Manager CPM Field Devices Read More »

Construction Method Statements, HVAC Method Statements, Method Statements

Gypsum Board Suspended Ceiling Installation Method Statement

Below is best method statement for gypsum board ceiling that can be useful for any kind of project submission and site works. The purpose of this ceiling method statement is to ensure that the Gypsum Board Suspended Ceiling and related activities are executed safely, in accordance with the contract requirements and that all quality assurance

Gypsum Board Suspended Ceiling Installation Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Method Statement for Fabrication & Installation of Tensile Fabric Shades

This method statement covers the detailed procedure to be followed for fabrication and installation of steel structure and fabric components of the tensile fabric shades that includes: Shades over Outdoor Playgrounds Shades over Swimming Pool Car Park Shades Fabric Roof over Cafeteria This procedure shall be read in conjunction with project specification wherever applicable. Below is the

Method Statement for Fabrication & Installation of Tensile Fabric Shades Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Concrete Placing, Curing and Defect Rectification Method Statement

Below is a brief method statement that describes the practices and methods with regards to concrete placing, curing and defect rectification. Below is list of reference documents useful for this method statement. Contract specification cast in place in concrete. Hazard Analysis table. Inspection and Test Plan BS 8110 Methods of Concrete placing, curing and defect

Concrete Placing, Curing and Defect Rectification Method Statement Read More »

Construction Method Statements, Method Statement for Civil Works, Method Statements

Testing and Commissioning Procedure For Structured Cabling System SCS

Below is a complete method statement that can be followed for performing testing & commissioning of structured cabling system including voice, telephone and data systems. Copper Cable Testing & Commissioning Method Statement Overview: Characterizing cabling provides useful data for the support of future equipment application. The verification of the transmission performance of cable plant through field

Testing and Commissioning Procedure For Structured Cabling System SCS Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Installation Of Electrical Systems For HVAC Wild Air Cooling of Projects

This method statement details the method related to sequence of installation of electrical works in order to achieve the wild air cooling for under construction building of large projects.  The installation of electrical works such as panel installation comprises the following activities. Site Clearance. Installation of necessary containment system. Area clearance for Electrical Room, Plant

Installation Of Electrical Systems For HVAC Wild Air Cooling of Projects Read More »

HVAC Method Statements, Method Statements