Download Method Statement for Installation of Closed Control Units CCU

The installation of Close Control Units (CCUs) shall be carried out by qualified HVAC, electrical, and controls personnel using approved materials, calibrated instruments, certified lifting equipment, and manufacturer-recommended procedures.

All activities shall comply with approved shop drawings, project specifications, ASHRAE guidelines, and consultant requirements.

Particular attention shall be given to unit positioning, vibration isolation, stress-free piping connections, condensate drainage, electrical safety, control integration, and quality inspections to ensure reliable and precise environmental control for critical facilities prior to testing, commissioning, and handover. 

Download package contains:

  • Method Statement
  • Checklist for Installation
  • Inspection & Testing Plan
  • Risk Assessment

 

You only need to change project name / insert logos and the same shall be ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

 

Method Statement For Installation Of Closed Control Unit CCU

Download Link:


Discover more from Method Statement HQ

Subscribe to get the latest posts sent to your email.