Web Master

uPVC Pressure piping system

uPVC High Pressure Water Supply Piping System Installation Procedure

Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of shop drawings, technical submittals, inspection and test plans are in the work place […]

uPVC High Pressure Water Supply Piping System Installation Procedure Read More »

Method Statements, Plumbing Method Statements, Pressure Testing

LPG Storage Tank & Containers Standard Requirements

Containers shall be designed, fabricated, tested and marked (or stamped) in accordance with the Regulations of the U.S. Department of Transportation (DOT), the “Rules for the Construction of unfired Pressure Vessels”, Section VIII, Division 1, ASME Boiler and Pressure Vessel Code, or the API-ASME Code for unfired Pressure Vessels for Petroleum Liquids and Gases applicable

LPG Storage Tank & Containers Standard Requirements Read More »

Technical Articles
water spray system installation method statement

Water Spray Firefighting System Installation Method Statement

Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High Velocity Deluge Valve, OS & Y Valve Electrical Devices Pipe Wrenches Hammer Chisel

Water Spray Firefighting System Installation Method Statement Read More »

Construction Method Statements, Method Statements, Plumbing Method Statements
main-distribution-board MDB Testing Procedure

Main Distribution Board MDB Testing & Commissioning Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is

Main Distribution Board MDB Testing & Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves

These instructions relate only to Crane Gem rubber lined Butterfly valves, which are designed and manufactured to provide isolation, or can be used for regulation, of flow of suitable fluids. Valves must be installed into a well-designed system and it is recommended that the system be inspected in accordance with the appropriate member state legislation.

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves Read More »

Plumbing Method Statements, Technical Articles

INSTALLATION, SETTING AND MAINTENANCE INSTRUCTIONS CRANE BALANCING VALVES

SCOPE OF THIS DOCUMENT COVERS BELOW MENTIONED BALANCING VALVES: DM921 & DMG921 DOUBLE REGULATING VALVE (DRV) DM931 & DMG931 DA931 & DAG 931 VARIABLE ORIFICE DOUBLE REGULATING VALVE (VODRV) DM941 & DMG 941 DA941 & DAG941 FIXED ORIFICE DOUBLE REGULATING VALVE (FODRV) FITTING PRESSURE TEST VALVES The pressure test valve with the red tag should

INSTALLATION, SETTING AND MAINTENANCE INSTRUCTIONS CRANE BALANCING VALVES Read More »

Preventive Maintenance, Technical Articles
Scroll to Top