Step Ladder Safety Procedure & Control Measures for Safe Work

A ladder is a simple, versatile and relatively inexpensive piece of equipment to use on a construction project or at home level. The temptation therefore is to use it for all sorts or work without considering whether the risk warrants an alternative method of work before it is used for this purpose. However, the circumstances… Read More »

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Most accidents from roofs could have been prevented by the identification of hazards and by the provision and proper use of readily available equipment. As a high risk activity, it is important that all roof work is pre planned. Falls and falls of materials are the major cause of injury; therefore a safe system of… Read More »

Control of Engineering Documents Procedure for Quality Management System

This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects are duly registered, reviewed, approved and distributed in a controlled manner. Procedure of… Read More »

Inspection and Quality Control Questionnaires

Q. What is QA/QC? QA/QC means, “Quality Assurance/Quality Control” the purpose of this (QA/QC) is to establish the sequence of requirement for the quality of material, quality of works, its inspection and records. Q. What are basic responsibilities of QA/QC personals? To ensure execution of works and comply fully as per standard and approved specs.… Read More »

Computer Based Central BMS Submittals & Controller Requirements

ACCEPTABLE BID PROCEDURES FOR BMS SYSTEM It is the intent of this specification to define a state-of-the-art distributed computerized software Integrated Building Management and Control System which is user friendly, has known reliability, is extremely responsive, and which is to be designed, installed, implemented, and supported by a local office of the manufacturer by people… Read More »

Method Statement For Testing And Commissioning Of Laboratory Air Flow Control System & Fumes Hood Monitoring

Below is the method statement description for performing the testing and commissioning of laboratory air monitoring and fumes hood system for any type of chemical and research laboratory. Method Statement For Testing And Commissioning Of Laboratory Air Flow Control System & Fumes Hood Monitoring System. Following tools shall be arranged before starting the T&C job.… Read More »

Download Method Statement for UPS & Accessories Installation

Download Method Statement for UPS & Accessories Installation  Download package contains the Method Statement + Checklist for Installation + Inspection & Testing Plan + Quality Control Procedure QCP +  Risk Assessment   You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is… Read More »