Document Grid Test
Document Grid Test Read More »
Introduction This method statement describes the installation procedure for Air Handling Units (AHU) including preparation, installation, inspection, testing and commissioning. Purpose To ensure installation complies with project specifications, approved shop drawings and manufacturer recommendations. Scope Applicable to all AHU installations on the project. References Responsibilities Project Manager Site Engineer QA/QC Engineer HSE Officer Materials Air
Method Statement for Installation of Air Handling Unit (AHU) Read More »
This is a test page for fire alarm system installation.
Method Statement for Testing & Commissioning of Fire Alarm System Read More »