Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery

Below sequence of operation is for Variable Volume Type FAHU with Plate Heat Recovery system. The system shall be variable volume package Fresh Air Handling Unit. The scope of the unit shall consist of: Supply Side accessories Intake motorized damper Panel (Pleated) Filter Bag Filter Cooling Coil Supply Fan (with VFD) Plate Heat Exchanger Intake and discharge […]

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery Read More »

Building Management System, HVAC Method Statements, Testing & Commissioning
SOA of AHU

Sequence of Operation for Single Zone Variable Volume Type Recirculating Air Handling Units AHU

Below sequence of operation is for single zone Variable Volume type recirculating Air Handling Units AHU’s. The system shall be variable volume package Fresh Air Handling Unit. The covering of the sequence shall consist of: Supply Side coverage of scope Exhaust Side coverage of equipment’s Sequence of Operation The Variable Volume re-circulating type AHUs for single zone

Sequence of Operation for Single Zone Variable Volume Type Recirculating Air Handling Units AHU Read More »

Building Management System, Testing & Commissioning

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight

Drainage Pipe Installation & Hydrostatic Testing Method of Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements

Method Statement for Installation of GI Ducts for HVAC System

This mechanical hvac method statement covers the installation of GI ductwork. Procedure defines the method used to ensure GI ducting installation has been carried out as per contract requirements and best practices. The method statement gives details of how the work will be carried out and what health and safety issues and controls are involved.

Method Statement for Installation of GI Ducts for HVAC System Read More »

Duct Works, HVAC Method Statements
Reinforcement-Bars-requirement-sizes-and-weight

Concrete Reinforcement Standard Requirements and Specifications

All reinforcement for use in the permanent works shall be specified on the drawings and shall comply with the Standards specified below. Deformed bars shall have Type 2 bond classification. BS or American Standards are applicable as mentioned but not limited to the following. BS 4449: Carbon Steel Bars for Reinforcement of Concrete BS 8666-2000, BS EN

Concrete Reinforcement Standard Requirements and Specifications Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Loading-Platform-Construction-Method-Statement

Loading Platform Erection, Assembling and Installation Method Statement

The Scope of this method statement covers all operations and associated activities involved in safe and efficient erection and construction of Loading Platforms including assembling and installation for efficient and effective utilization of Platforms in execution of project works. Following tools / equipment shall be arranged. JCB Tower crane Props / jacks Loading platform (Pre

Loading Platform Erection, Assembling and Installation Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements