The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System at a project in accordance to the specification and manufacture’s recommendation to reach the required quality and satisfying the requirements
Read Complete Method
Installation of Control Panel for ACS Access Control System. Mount the controller to a panel using screws. Connect the Ethernet, Service port and RS-485 connections based on your requirement. Connect the Tamper, Universal Inputs, card reader/Keypad and input/output connections based on the requirement.
Read Complete Method
The purpose of this method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant operators Manual and User’s guide. This procedure ensures the
Read Complete Method
Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop
Read Complete Method
Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety
Read Complete Method
Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat Exchanger’s as indicated unless deviations
Read Complete Method