Piping Method Statements

Process Pipe Pneumatic Testing Manifold Connection Diagram

Method of Statement for Pneumatic Testing of Distribution and Process Piping System

The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management Team, hydro/pneumatic pressure testing engineer and all personnel working on site. Below is […]

Method of Statement for Pneumatic Testing of Distribution and Process Piping System Read More »

Method Statements, Piping Method Statements, Piping Works, Plumbing Method Statements, Pressure Testing, Stainless Steel Fabrication, Testing & Commissioning

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to meet the requirements of applicable codes and client’s project specifications for pipe fabrication

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing Read More »

Method Statements, Piping Method Statements, Pressure Testing, Stainless Steel Fabrication, Templates, Test Reports & Forms
Fire Fighting pipe painting procedure method statement

Painting Procedure for Firefighting and Fire Protection Piping Network

This method of statement covers the painting procedure of firefighting and fire protection pipe, fittings and accessories for any kind of construction project. The pipe painting procedure defines the method used to ensure the painting has been carried out as per contract specifications and industry best practices. It gives details of how the work will

Painting Procedure for Firefighting and Fire Protection Piping Network Read More »

Fire Suppression System, Piping Method Statements, Piping Works, Plumbing Method Statements
medical gas piping system method of statement

Method statement for the Installation of Medical Gases System in Hospital Project

This method statement covers the installation of medical gases system horizontal and vertical piping installations through all the areas in the hospital project. The medical gas pipes shall run horizontally in the main routing in the corridors. The vertical running will be through the pipes drops to the medical gases outlets, bed head units and

Method statement for the Installation of Medical Gases System in Hospital Project Read More »

Method Statements, Piping Method Statements, Plumbing Method Statements

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes

This plumbing method of statement covers the installation of domestic water supply piping and accessories. The procedure defines the method to ensure the installation work is done as per contract requirements, specifications and best practices. It gives details of how to carry out the work and what health and safety issues and controls are necessary.

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Piping Works, Plumbing Method Statements
Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

This method statement procedure covers the Testing and Commissioning of sprinkler and firefighting standpipe systems installed at project, this will also ensure proper workmanship and that the work conforms to contract documents and applicable NFPA regulations. Commissioning manager will have the all the responsibility for the execution  of the Testing and Commissioning  activities, quality  and

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement Read More »

Fire Suppression System, Method Statements, Piping Method Statements, Testing & Commissioning
pipeworks method of statement

Method of Statement For Cast-in Pipeworks (Mild Steel or Ductile Iron)

This pipeworks procedure is applied to all the cast-in pipeworks (mild steel or ductile iron) for the project site in water treatment facility. The contents or procedures provided in this document are based on the general good water industry practices and manufacturer standard recommendation. The installation work contractor shall follow this procedures strictly unless otherwise

Method of Statement For Cast-in Pipeworks (Mild Steel or Ductile Iron) Read More »

Method Statements, Piping Method Statements, Plumbing Method Statements

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight

Drainage Pipe Installation & Hydrostatic Testing Method of Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements