The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to
Read Complete Method
Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss:
Read Complete Method
Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs
Read Complete Method
This plumbing method statement covers the nature and type of work for drainage outlets stainless steel shower gullies for the project as per site requirements. Method statement also covers frequency of which inspections are to be carried out. All documentary requirements for
Read Complete Method
The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management
Read Complete Method
The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to