Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method of Statement

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement

This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible for overall management including quality and HSE requirements of all construction activities at […]

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement Read More »

HVAC Method Statements, Stainless Steel Fabrication
Method Statement For Installation Of Automatic Aluminium Sliding Door

Aluminum Sliding Doors Installation Method of Statement

Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. Ensure that shop drawings is complete and method of aluminium door fixation, details of aluminium units is approved

Aluminum Sliding Doors Installation Method of Statement Read More »

Aluminium & Glass Work Methods, Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Occupational Health and Safety Procedure for Mobile Elevated Work Platform

Below is a precise procedure that provides instructions for the safe use of Mobile Elevated Work Platforms (EWP), applicable for all kind and size of projects. Overall project director and project HSE team is having responsibilities for the implementation of this occupational health and safety procedure and also relevant applicable standards i.e. ISO 16368:2024 –

Occupational Health and Safety Procedure for Mobile Elevated Work Platform Read More »

Construction Method Statements, Method Statements, Occupational Health and Safety, Risk Assessment
Method Statement for Scaffolding, Formwork, Rebar Installation and Concreting

Method of Statement for Formwork, Rebar Installation and Concreting

Below is a precise civil work method of statement that covers the detailed procedure for the scaffolding / formwork, rebar installation and concreting operation applicable for footing, pedestals and pile caps etc. Also to explain how footing, pile caps, trenches, grade beam and grade slab work shall be carried out under controlled conditions. Tools &

Method of Statement for Formwork, Rebar Installation and Concreting Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Construction Methodology for Underground Services Protection

Construction Methodology for Underground Services Protection

Purpose of below safety method statement is to provide instructions for ensuring the safe operations involved with ground penetrations so that underground services are not damaged and also to ensure the safety of workers. Overall the project manager is having responsibilities for the implementation of this standard safety procedure. Hazard Identification and Risk Assessment a)

Construction Methodology for Underground Services Protection Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Plastering Method Statement

Plastering Method Statement

Below is a precise plastering work method statement that is very useful for civil engineers to understand how best quality plaster work can be done. This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project civil specifications. Below are the plastering tools or plastering equipment involved in

Plastering Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Flooring Installation Method Statement for Marble and Granite Tiles Installation

Flooring Installation Method Statement for Marble and Granite Tiles Installation

This flooring installation method statement covers the detailed procedure to be followed for supply & installation of Marble and Granite tiles on floor, stairs, walls and counters and other areas as per the schedule of finishes for the project. Civil site engineer shall ensure that all materials shall be delivered to site complying with approved

Flooring Installation Method Statement for Marble and Granite Tiles Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements