Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Method Statement For Installation & Testing of Sanitary Fittings & Fixtures

Sanitary Wares Installation Instructions

Below we have given brief sanitary wares installation instructions, that also covers installation & testing of sanitary fittings, plumbing wares, plumbing fixtures etc. This plumbing method of statement is very useful for the use on any kind of construction project. The procedure is simple and covers all aspects of a good sanitary ware work. Necessary […]

Sanitary Wares Installation Instructions Read More »

Method Statements, Plumbing Method Statements
plumbing risk assessment sample page

Download Plumbing Risk Assessments Covering 22 Activities – Editable Format

Now you can download complete set of risk assessments for the building construction plumbing works. The files are in editable word formats and you only need to add your company name project logo etc. Best suited for any kind of plumbing construction project. List of activities for which plumbing risk assessments are available: Booster Pumps Installation

Download Plumbing Risk Assessments Covering 22 Activities – Editable Format Read More »

Occupational Health and Safety, Plumbing Method Statements, Risk Assessment

Sanitary Wares Installation Method Statement

If you need to learn the method for installation of sanitary ware fittings, then you can use step wise procedure as per below method statement. Here are brief sanitary wares installation instructions. Storage of Sanitary Fittings Upon completion of receiving QC inspection, segregate the sanitary ware model / size wise and store accordingly for easy

Sanitary Wares Installation Method Statement Read More »

Method Statements, Plumbing Method Statements
Safework Method of Statement for Production & Erection of Precast Concrete Boundary Wall Panel

RCC Precast Boundary Wall Method Statement

Below is a precise method statement for the rcc precast boundary wall construction and installation as per project specifications and approved drawings. Quality requirements shall be complied during all activities as per project quality plan, specifications and approved method statements. List of Equipment’s Below is list of necessary plant and equipment for precast boundary wall

RCC Precast Boundary Wall Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

The purpose of this hydrostatic testing procedure is to list out various steps involved in hydrostatic pressure testing, pigging, draining, swabbing and drying of pipelines for any kind and size of pipeline project in line with the project specifications and applicable standards and regulations. Scope of work covers the water supply quality and treatment, Internal

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines Read More »

Plumbing Method Statements
Automatic Transfer Switch Testing Requirements

Automatic Transfer Switch Testing Requirements

As part of the Field Quality Control as per specification clauses, testing and commissioning of the ATS Panel will be carried out as per the approved method statement under the direct supervision of factory authorized service representative. Below are standard ATS testing requirements that shall be considered while doing the electrical testing and commissioning activities.

Automatic Transfer Switch Testing Requirements Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing

The purpose of this method statement for reinforcement works is to lay down the systematic procedures for the various activities required for installation of reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings, bar bending schedule and project specifications. This method of statement covers the general procedures

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
method statement for electrical wiring installation

Method Statement for Electrical Wiring Installation

Below is a precise method statement for electrical wiring installation for any kind and size of project. This work method statement explains and covers the wiring through conduits and its termination to the equipment / boards etc. Required Tools Pulling Rope Lubricant Markers Masking Tape Quality & Safety Requirements Quality control on site will be

Method Statement for Electrical Wiring Installation Read More »

Electrical Method Statements, Method Statements