Temporary-Retaining-Wall-Installation-Method-Statement

Method Statement for Temporary Retaining Wall Installation

The existing ground level varies between + 3.52 m DMD to + 4.29 m DMD. The working platform level for Double U wall is considered at the average ground level. A Double U channel beam wall with one layer of tie-back anchors shoring system is proposed along the four sides of the plot for a

Method Statement for Temporary Retaining Wall Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works
horizontal-bladder-tank-installation Method Statement

Method Statement for Horizontal Four Flange Bladders Installation in Tank

Visually inspect bladder for correct size and obvious defects such as perforations before starting. Lay bladder on a dry, clean surface such as a cleanly swept floor, tarp, etc. Smooth out all wrinkles and folds. Roll up the small flange necks at top and bottom of bladder, the use duct tape to tape securely so that they

Method Statement for Horizontal Four Flange Bladders Installation in Tank Read More »

Fire Suppression System
Piling Cage Installation

Method Statement for Pile Reinforcement and Concrete Casting

Subsequent to the completion of the pile drilling, the borehole depth will be checked and verified versus the depth given on daily piling sequence and pile data.  Only after borehole depth check can the cage be lowered into the borehole.  A reference site datum level will be given to ensure the correct positioning of the

Method Statement for Pile Reinforcement and Concrete Casting Read More »

Civil Engineering Methods, Method Statement for Civil Works