2018
Oct
31

Installation Method Statement for Settling Tank Shells Using Jack Lifting Method

Installation Method Statement for Settling Tank Shells Using Jack Lifting Method

The purpose of this method statement is to explain the various steps involved in lifting the Settling Tank shells by Jack Lifting Method. Prepare work permits, JSA and working procedure for approval prior to commencing work. Organize job safety meeting with all

2018
Oct
20

Method Of Statement For Structural Excavation & Backfilling

Excavation and Backfilling for Culverts, Storm Sewers and Ducts Precast concrete and steel pipe culverts and pipe ducts will be installed in trenches cut into previously constructed and compacted embankment either from the subgrade or from an embankment height at least twice

2018
Oct
18

Method Statement for Earthwork Related to Track Work

Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench