Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Method of Statement for Installation of Power / Electrical Bus bar

Method of Statement for Installation of Power / Electrical Bus bar

Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels.  Before starting the installation of power electrical busbar following tools shall be arranged: PREPARATION FOR BUS BAR INSTALLATION The marking of the route on site to be carried out prior to commencement […]

Method of Statement for Installation of Power / Electrical Bus bar Read More »

Electrical Method Statements
Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case of any contradictory matters that may arise. Purpose of this method is to

Water Leak Detection System Testing & Commissioning Method of Statement Read More »

Building Management System, Electrical Method Statements, Method Statements, Plumbing Method Statements, Testing & Commissioning
Pedestrian Walkway Concreting - Broom Finish Concrete

Pedestrian Walkway Concreting – Broom Finish Concrete

The purpose of this concreting method statement is to define the guidelines for the preparation of the concreting work for pedestrian walkway (broom finish) and to ensure the safe execution of all the concrete works during construction phases of the project so as to eliminate the risk of injury or damage to personnel, equipment and

Pedestrian Walkway Concreting – Broom Finish Concrete Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Method Statement for Excavation & Backfilling for Open Foundations / Footings

Below is a brief method statement that details general procedures to be followed for excavation & backfilling of foundations, Sub-structures & Trenches for any type of the construction and road project. The method covers survey works, excavation, backfilling, compaction and area cleaning after the completion of works. Separate work method statement, will be generated by

Method Statement for Excavation & Backfilling for Open Foundations / Footings Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Roadworks
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports

Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related standards and codes: ASTM A416/A416M: Standard Specification for Steel Strand, Uncoated Seven-Wire for

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Technical Articles

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work will be carried out and what health and safety requirements are implemented on

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories Read More »

Construction Method Statements, Duct Works, HVAC Method Statements, Method Statements
Bored Pile (Cast-in-Situ) Construction Method Statement

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated risks involved, develop and implement adequate control measures and to provide a safe

Bored Pile (Cast-in-Situ) Construction Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements