Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

45° Elbow to Pipe Fit Up

Pipe Welding Work and the Welder’s Qualification Test Procedure

Below method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes implementing the company commitments for achieving the best quality of welding works. The document outlines the method for executing welding process for pipe work and welding procedure qualification test for welders. This method statement covers […]

Pipe Welding Work and the Welder’s Qualification Test Procedure Read More »

HVAC Method Statements, Plumbing Method Statements, Stainless Steel Fabrication
Roof Trusses Fabrication swms

Roof Trusses Fabrication Safe Work Method Statement SWMS

The sub-contractor or person doing the work is responsible for carrying out a particular action, as listed in this safe work method statement SWMS. The supervisor is responsible to ensure that the sub-contractor or person doing the work is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the

Roof Trusses Fabrication Safe Work Method Statement SWMS Read More »

Construction Method Statements, Method Statement for Civil Works, Method Statements, Occupational Health and Safety, Stainless Steel Fabrication
Construction Project Management and Methodology

Method Statement for an EPC Construction Project

This method statement for construction project consists of the following sections. 1. General Execution Strategy 2. Details of Design and Engineering Plan 3. Material Management Planning and List of Long Delivery Material 4. Construction and Installation Activity 5. Safety and Environmental Plan 6. Quality Assurance Planning Section 1. General Execution Strategy Contractor will be responsible

Method Statement for an EPC Construction Project Read More »

Civil Engineering Methods, Method Statements, Project Planning, Quality Management, Technical Articles
Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

This method statement procedure covers the Testing and Commissioning of sprinkler and firefighting standpipe systems installed at project, this will also ensure proper workmanship and that the work conforms to contract documents and applicable NFPA regulations. Commissioning manager will have the all the responsibility for the execution  of the Testing and Commissioning  activities, quality  and

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement Read More »

Fire Suppression System, Method Statements, Piping Method Statements, Testing & Commissioning
Ventilation Fans Installation Method Statement

Ventilation Fan Installation Method Statement

This document applies to the inward site inspection, installation and inspection methods to be adopted for the ventilation fan installation. After receiving on the project site, ventilation fans shall be stored in a clean / dry place and adequate covering by tarpaulin sheets to be provided to protect the equipment from deposition of construction dust

Ventilation Fan Installation Method Statement Read More »

HVAC Method Statements, Method Statements
End Connection dimensions for y strainer

YStrainer Installation and Maintenance Guidelines

This page is providing you some important guidelines for installing and maintaining the Y-Strainers. These tips shall help you in achieving the quality work and right first time. If you want to read a full method statement for strainer installation you can search our website. First we shall see some useful installation tips and this

YStrainer Installation and Maintenance Guidelines Read More »

Method Statements, Preventive Maintenance, Technical Articles
Fan Powered Box FPB installation method

Method Statement for Installation of Fan Powered Box Units

Unless otherwise specified, all installation shall be in accordance to approved shop drawings and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Fan Powered Box units. Install Fan Powered Box as indicated unless deviations to layout are approved on coordination drawings. Transfer the Fan Powered Box units from the stores

Method Statement for Installation of Fan Powered Box Units Read More »

Duct Works, HVAC Method Statements, Method Statements

Butterfly Valve Installation and Maintenance Procedure

This method is for installation and maintenance of wafer type butterfly valve or lug style butterfly valve with a cast iron body construction, SS stem and disc and either EPDM, BUNA-N or Viton liners. Although the procedure is specifically provided for bi-Torq butterfly valves but is useful for any other such type of valves. General

Butterfly Valve Installation and Maintenance Procedure Read More »

Method Statements, Plumbing Method Statements, Preventive Maintenance
error: Content is protected !!
Scroll to Top