Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Bulldozer and Excavator Track Replacement Standard Procedure

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure

Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the control of the contractor. General Requirements a) Clean the unit before service. b) […]

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure Read More »

Civil Engineering Methods, Method Statements, Preventive Maintenance, Technical Articles
Process Pipe Pneumatic Testing Manifold Connection Diagram

Method of Statement for Pneumatic Testing of Distribution and Process Piping System

The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management Team, hydro/pneumatic pressure testing engineer and all personnel working on site. Below is

Method of Statement for Pneumatic Testing of Distribution and Process Piping System Read More »

Plumbing Method Statements, Pressure Testing, Stainless Steel Fabrication, Testing & Commissioning

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to meet the requirements of applicable codes and client’s project specifications for pipe fabrication

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing Read More »

Method Statements, Piping Method Statements, Pressure Testing, Stainless Steel Fabrication, Templates, Test Reports & Forms
medical gas piping system method of statement

Method statement for the Installation of Medical Gases System in Hospital Project

This method statement covers the installation of medical gases system horizontal and vertical piping installations through all the areas in the hospital project. The medical gas pipes shall run horizontally in the main routing in the corridors. The vertical running will be through the pipes drops to the medical gases outlets, bed head units and

Method statement for the Installation of Medical Gases System in Hospital Project Read More »

Method Statements, Piping Method Statements, Plumbing Method Statements

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes

This plumbing method of statement covers the installation of domestic water supply piping and accessories. The procedure defines the method to ensure the installation work is done as per contract requirements, specifications and best practices. It gives details of how to carry out the work and what health and safety issues and controls are necessary.

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes Read More »

Piping Method Statements, Plumbing Method Statements

Method Statement for Preparation and Construction Of Cast In Place Concrete Works for Substructures

The purpose of this civil work method statement is to define the procedure for the preparation and construction of Cast in Place Concrete Works for substructures in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. Click Here to download Full Civil Method Statement

Method Statement for Preparation and Construction Of Cast In Place Concrete Works for Substructures Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works

Pile Cutting & Trimming Method Statement

The purpose of this Method Statement is to define the procedure for the cutting of piles to the approved cut off level. General sequence of work may include: Auger fitted with appropriate head Auger drilled into ground to required depth. Steel reinforcement cage lowered in the bore hole, with the upper lap length enclosed in

Pile Cutting & Trimming Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works
Steel Structure Building Construction Procedure

Steel Structure Building Construction Procedure

This procedure is useful for building construction based upon the steel structure erection work. Based on the design and specification, this document provides a proper step wise procedure and quality and safety management of the steel structure work. The following items/equipments are basic requirements  for building construction of steel structure works at a large scale

Steel Structure Building Construction Procedure Read More »

Construction Method Statements, Stainless Steel Fabrication
error: Content is protected !!
Scroll to Top