Damaged Cracked Concrete Repair Of Large Cracks

Method Statement For Damaged Cracked Concrete Repair Of Large Cracks

This procedure shall apply to the repair of all defective cracked concrete in large quantities, using high strength, free flowing, cementitious micro concrete  of size 40 – 300 mm thickness. Concrete Preparation The areas to be repaired are to be as shown on the drawings or as indicated by the Client/Consultant. Affected areas are to be […]

Method Statement For Damaged Cracked Concrete Repair Of Large Cracks Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Project Construction Methodology

Construction methodology or project execution methodology refers to the planned method of construction, taking into account all contractual and legal requirements, construction constraints, risks, and opportunities. Project Methodology includes the temporary and permanent works and the services required to complete the construction works. Below is given a detailed methodology for construction of a civil project, which

Project Construction Methodology Read More »

Civil Engineering Methods, Quality Management, Technical Articles

Sequence of Operation for Domestic Water Filtration System Booster Pump Circulation Pump

Sequence Of Operation for Domestic Water Filtration System Booster Pumps Circulations Pumps copper silver Ionization, Plate heat exchangers. Copper Silver Ionization Disinfectant Units Disinfection process using copper silver ionization shall be monitored by the BMS to provide the following information. The system fault status shall be monitored through volt free contact (VFC). A graphical representation

Sequence of Operation for Domestic Water Filtration System Booster Pump Circulation Pump Read More »

Building Management System

Sequence Of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System

Sequence Of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System Primary/Secondary Chilled Water Pumps The secondary chilled water pump (SCHWP) sets will be controlled through VFD drives to maintain the desired system differential pressure. A minimum of 3 differential pressure transducers will be connected to the DDC controllers of the chilled water

Sequence Of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System Read More »

Building Management System

Sequence Of Operation For Closed Control Unit CCU

Closed Control Unit (CCU) Sequence Of Operation The server rooms shall be provided with DX type Close Control Units. The system shall be constant volume package Close Control Unit (CCU). Electrical Rooms, IDF, MDF Rooms etc The unit shall consist of: Panel (Pleated) Filter Water Steam Humidifier Direct Expansion (DX) Cooling Coil & Condenser Supply

Sequence Of Operation For Closed Control Unit CCU Read More »

Building Management System

BMS Sequence Of Operation SOO for HVAC Systems

Below is a typical sequence of operation for the HVAC system & equipment’s like packaged units, Fan Coil Units, Split Units, Extract fans, Kitchen Extract fans and general ventilation fans etc. This sequence of operation is demonstrated by using the BMS building management system software during testing & commissioning of the project. Below information is

BMS Sequence Of Operation SOO for HVAC Systems Read More »

Building Management System, Method Statements

Sequence Of Operation For Electrical, Low Current & ELV Systems

Fire Alarm Panels Sequence Location: Fire Alarm Panels: Various Locations (refer to Fire Alarm Layout) Each Fire alarm panel will be monitored by the DDC controller to provide a system healthy, fault and alarm. All information shall be displayed on the BMS Supervisor. All MCC and DDC control panels will be linked to the Fire Alarm

Sequence Of Operation For Electrical, Low Current & ELV Systems Read More »

Building Management System, Construction Method Statements, Electrical Method Statements