Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

excavation measurement procedure

Method of Measurement for Structural Excavations

Measurement of Structural excavation will be limited to excavation for foundation for bridges, retaining walls, box culverts or cross sectional area exceeding 1 sq. mtr, box culvert wing walls, head walls, toe walls and aprons, manholes, pump houses and sub-stations. For box culverts 1 sq. mtr or less, pipe culverts, storm sewers and ducts, measurement […]

Method of Measurement for Structural Excavations Read More »

Civil Works Method Statements
Excavation Work Guidelines for Irrigation and Water Supply Projects

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is responsible in ensuring the implementation of construction procedure and method statement, supervising the

Excavation Work Guidelines for Irrigation and Water Supply Projects Read More »

Civil Works Method Statements

Agitator Installation Method Statement for Tanks and Vessels

The purpose of this Method statement is to explain the erection and installation of Agitator for tanks and vessels in Phosphoric acid plant or any chemical production facility. Function of the agitator is to maintain homogeneity in the fluid by creating turbulence. Generally Agitator consists of a big size shaft with a blade which is

Agitator Installation Method Statement for Tanks and Vessels Read More »

Civil Works Method Statements

Site Clearance Grubbing and Topsoil Removal Method Statement

Purpose of this procedure is to outline the steps for site clearance, grubbing and topsoil removal. The detailed guide will provide the clear steps undertaken to complete the process of the site clearance activities in a safe, systematic and efficient manner in compliance to the statutory and environmental requirements. Procedure also includes the removal and disposal of

Site Clearance Grubbing and Topsoil Removal Method Statement Read More »

Civil Works Method Statements

Vinyl, Rubber and Acrylic Flooring Method Statement

Below is given the safe Method Statement for performing the installation of vinyl Flooring in simple steps. Selected working area should be barricaded to avoid accidents & damages and obtain necessary clearances  and approvals from Engineers including MEP clearance. Inspection request to be raised and ensure its approval prior to start vinyl flooring. Ensure the

Vinyl, Rubber and Acrylic Flooring Method Statement Read More »

Civil Works Method Statements
Termite Control & treatment requirements

Standard Termite Control, Treatment and Application Requirements

This document covers termite control using approved insecticides executed in accordance with all applicable regulations in force in the country of project. Following documentation shall be submitted for the approval of consultant. Product Data: Treatments and application instructions Product Certificates: Signed by manufacturers of termite control products certifying that treatments furnished comply with requirements. Qualification

Standard Termite Control, Treatment and Application Requirements Read More »