2013
Nov
5

Testing & Commissioning Of Pressurization Unit – Chilled Water

1. Purpose The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Pressurization Unit through the guidelines contained herein so as to ensure that the job execution complies

2013
Nov
4

Testing & Commissioning Of Fire Pumps

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “Fire Pumps” through the guidelines contained herein so as to ensure that the job execution complies with the

2013
Oct
18

Transformer Installation Method of Statement for any type of Project

This method statement explains and covers the transformer installation & inspection procedure of cast resin Transformers, although it is applicable for any other type as well. Transformer is used to transform the high voltage powers to low voltages, so that it is

2013
Oct
17

Installation, Testing & Flushing Of Firefighting Piping System

Purpose & Scope The purpose of this method statement is to ensure that correct materials & equipment are used and agreed procedures are implemented during fabrication, installation, testing and flushing of firefighting piping sprinkler system. This method statement specifies the sequence and methodology to be

2013
Oct
6

Testing & Commissioning Of CCTV Camera – Method Statement

The objectives of the process of testing and commissioning of CCTV camera is to verify proper functioning of the equipments and system after installation, and to ensure the performance of the installed system meets the specified design intent through a series of tests and adjustments. Finally to

error: Content is protected !!