Method Statement for Condensate Drain Piping Installation Insulation & Testing (UPVC + GI)

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI)

This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework. The mechanical method statement defines the method that will be used to ensure […]

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI) Read More »

Plumbing Method Statements, Testing & Commissioning
Method of Statement for Installation of Power / Electrical Bus bar

Method of Statement for Installation of Power / Electrical Bus bar

Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels.  Before starting the installation of power electrical busbar following tools shall be arranged: PREPARATION FOR BUS BAR INSTALLATION The marking of the route on site to be carried out prior to commencement

Method of Statement for Installation of Power / Electrical Bus bar Read More »

Electrical Method Statements
Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case of any contradictory matters that may arise. Purpose of this method is to

Water Leak Detection System Testing & Commissioning Method of Statement Read More »

Electrical Method Statements, Testing & Commissioning

Mobile Heavy Equipment Recovery Standard Procedure

The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use of heavy mobile recovery equipment, although some of the general safety principles may

Mobile Heavy Equipment Recovery Standard Procedure Read More »

Civil Works Method Statements, Roadworks
Glazed Partitioning Method Statement for Glass Office Partitions

Glazed Partitioning Method Statement for Glass Office Partitions

Below is a precise method of statement for the installation of glazed partitions or glass office partitions. The first section gives the pre-installation requirements, we strongly recommend that all sections of this document be read thoroughly before site installation commences. It is important that the relevant Health and Safety legislation be observed at all times

Glazed Partitioning Method Statement for Glass Office Partitions Read More »

Aluminium & Glass Work Methods

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work will be carried out and what health and safety requirements are implemented on

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories Read More »

HVAC Method Statements
Cathodic Protection System for Storage Tanks Installation Method Statement

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the best quality workmanship for the scope of work. All project site, QA/QC and

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure Read More »

Civil Works Method Statements
error: Content is protected !!
Scroll to Top