Head Calculation For Irrigation Booster Pump
Station No. Valve Size of Valve Controller’s Program flow in lps Duration (min) Total flow as per specified duration (litres/day) 1 DV – 1 1″ A 0.72 60 2592 2 DV -2 1″ A 0.05 60 180 2772 Total run time
Construction Documentation Portal
Station No. Valve Size of Valve Controller’s Program flow in lps Duration (min) Total flow as per specified duration (litres/day) 1 DV – 1 1″ A 0.72 60 2592 2 DV -2 1″ A 0.05 60 180 2772 Total run time
Pressure Vessel is briefly is a storage device, which could store fluids above 15PSI. These are generally designed based on ASME codes, if vessel does not have heating mechanism(unlike boilers), it can be designed by ASME Section VIII. For PVs with pressure
On this page you can find typical project organization chart and job descriptions of the project team. The job descriptions include: Project Manager Senior Project Engineer Architectural Coordination Engineer Planning Engineer Quantity Surveyor Safety Officer Quality Control Engineer Structural Engineer Civil Engineer
This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel
This method is applicable for all fixed, transportable and mobile machinery and equipment used in the building, construction and earthworks activities of the company. Where plant resource is required on the projects, plant department will be contacted to provide equipment or services.