The purpose of this method statement is to explain the various steps involved in lifting the Settling Tank shells by Jack Lifting Method. Prepare work permits, JSA and working procedure for approval prior to commencing work. Organize job safety meeting with all
Read Complete Method
1. Purpose The purpose of this project management procedure is to ensure that prior to submitting a Tender the proposed terms and conditions are appropriately reviewed in order to: – gain an overall appreciation of the risk profile of the proposed contract – identify
Read Complete Method
Following Plant & Equipment to be arranged for the project fencing work. Tracked excavator Tractor and trailer Post driver Chainsaw Small tools (hammers, nail guns, wire cutters etc.) All personnel entering the site shall have received site safety induction and have attended a
Read Complete Method
All necessary clearing and grubbing and topsoil excavation (where necessary) will be completed prior to the beginning of the excavation. The location will be demarcated to show the limits and depths of the excavation. The disturbing and spoiling material and vegetation outside
Read Complete Method
The spool fabrication will be implemented with the sequence of marking, cutting, fit-up, welding, and painting. Marking All materials shall be marked for identification and traceability with respect to installation area, sheet number and spool number. The cut pipe spools shall be
Read Complete Method
Excavation and Backfilling for Culverts, Storm Sewers and Ducts Precast concrete and steel pipe culverts and pipe ducts will be installed in trenches cut into previously constructed and compacted embankment either from the subgrade or from an embankment height at least twice
Read Complete Method