Safework Method of Statement for Production & Erection of Precast Concrete Boundary Wall Panel

RCC Precast Boundary Wall Method Statement

Below is a precise method statement for the rcc precast boundary wall construction and installation as per project specifications and approved drawings. Quality requirements shall be complied during all activities as per project quality plan, specifications and approved method statements. List of Equipment’s Below is list of necessary plant and equipment for precast boundary wall […]

RCC Precast Boundary Wall Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

The purpose of this hydrostatic testing procedure is to list out various steps involved in hydrostatic pressure testing, pigging, draining, swabbing and drying of pipelines for any kind and size of pipeline project in line with the project specifications and applicable standards and regulations. Scope of work covers the water supply quality and treatment, Internal

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines Read More »

Plumbing Method Statements
Automatic Transfer Switch Testing Requirements

Automatic Transfer Switch Testing Requirements

As part of the Field Quality Control as per specification clauses, testing and commissioning of the ATS Panel will be carried out as per the approved method statement under the direct supervision of factory authorized service representative. Below are standard ATS testing requirements that shall be considered while doing the electrical testing and commissioning activities.

Automatic Transfer Switch Testing Requirements Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

This method provides you guidelines for the safe use of aluminum mobile scaffolds and standard instruction applies to all applications where people are using aluminium mobile scaffold towers. Overall project manager and HSE manager are responsible for the implementation of this standard safety procedure. The use of lightweight aluminium mobile scaffold towers on construction sites

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment Read More »

Occupational Health and Safety, Risk Assessment
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing

The purpose of this method statement for reinforcement works is to lay down the systematic procedures for the various activities required for installation of reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings, bar bending schedule and project specifications. This method of statement covers the general procedures

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
method statement for electrical wiring installation

Method Statement for Electrical Wiring Installation

Below is a precise method statement for electrical wiring installation for any kind and size of project. This work method statement explains and covers the wiring through conduits and its termination to the equipment / boards etc. Required Tools Pulling Rope Lubricant Markers Masking Tape Quality & Safety Requirements Quality control on site will be

Method Statement for Electrical Wiring Installation Read More »

Electrical Method Statements, Method Statements
Electrical Switchgear Installation Method Statement for 11KV HV Panel

Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning

The purpose of this electrical method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant ATS operators manual and User’s guide. By following this procedure contractor shall ensure that the method used for testing and

Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
error: Content is protected !!
Scroll to Top