Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Lifting Operations Method of Statement Download

Download Lifting Operations Standard Method Statement in editable MS Word Format

Download Lifting Operations Standard Method Statement in editable MS Word format with all necessary forms and formats. You only need to add your company logo and project details etc. and your safety document is ready for submission and approval from client/consultant. This standard lifting activity instruction outlines the minimum requirements for the use, operation and […]

Download Lifting Operations Standard Method Statement in editable MS Word Format Read More »

Method Statement for Civil Works, Occupational Health and Safety, Risk Assessment

Download Method Statement For Testing & Commissioning of Laboratory Gas System

Download Method Statement For Testing & Commissioning of Laboratory Gas System  Download Package Contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list

Download Method Statement For Testing & Commissioning of Laboratory Gas System Read More »

Plumbing Method Statements, Testing & Commissioning
Installation method statement for Curtain Wall

Installation of Glazed Aluminum Curtain Wall & Composite Cladding

You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be obtained and site dimensions shall be verified before start of any activities on

Installation of Glazed Aluminum Curtain Wall & Composite Cladding Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Method Statement for Hydrostatic Testing of Metallic Pipework

The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at the project and to be followed for all piping works at site. Prior

Method Statement for Hydrostatic Testing of Metallic Pipework Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Hot Water Calorifier Testing and Commissioning Method Statement

Hot Water Calorifier Testing and Commissioning Method Statement

This method statement is applicable for the testing and commissioning of hot water calorifier or water heater for any kind of building or projects. Arrange below tools before start of the work: Electrical Toolbox Box spanner set Pipe wrench Pre Commissioning Requirements Before commencing the testing and commissioning of calorifier the following shall be carried

Hot Water Calorifier Testing and Commissioning Method Statement Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning
Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method of Statement

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement

This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible for overall management including quality and HSE requirements of all construction activities at

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement Read More »

HVAC Method Statements, Stainless Steel Fabrication
Method Statement For Installation Of Automatic Aluminium Sliding Door

Aluminum Sliding Doors Installation Method of Statement

Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. Ensure that shop drawings is complete and method of aluminium door fixation, details of aluminium units is approved

Aluminum Sliding Doors Installation Method of Statement Read More »

Aluminium & Glass Work Methods, Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Civil Method Statement for RCC Columns and Shear Wall Construction

Below is a general method statement for illustrative purpose, there shall be different values for different parameters depending upon the type of project and climatic situations, which should be followed all the time. EQUIPMENT’S & TOOLS REQUIRED Hand saw, wire cutter, brush, Shovel Steel Brush Air compressor Plumb bob Line dory Concrete Pump Vibrator Trowel Spirit

Civil Method Statement for RCC Columns and Shear Wall Construction Read More »

Method Statement for Civil Works