Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

excavation for pond construction

Civil Method Statement for Pond Work

This civil Method Statement defines the procedure to carry out the pond work as per requirements in project specifications to ensure the safety and quality of the work. Method statement covers excavation activity, rebar installation, formworks, concrete pouring, curing of concrete, formwork dismantling, finishing, and other civil work base on civil work item list. Subcontractor […]

Civil Method Statement for Pond Work Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Occupational Health and Safety

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans  Download Package Contains the Method Statement + Inspection & Testing Plan + Checklists for Pre Commissioning  + Checklists For Testing & Commissioning You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans Read More »

HVAC Method Statements, Testing & Commissioning
Variable Air Volume VAV Installation Testing and Commissioning Method Statement

Sample Forms & Checklists For HVAC Installation Testing & Commissioning

You can download the sample forms and checklists for different activities which you can then reuse and customize as per your requirements. Below we have given list of checklists which you can download in one go by clicking the download link given below at the end of the list. Installation-of-HVAC-Duct-Work-System Installation-of-Internal-Lighting Installation-of-Lightening-Protection-System Installation-of-HVAC-Damper-Louver-and-Accessories Installation-of-Fans-and-Accessories Installation-of-Exposed-Conduit

Sample Forms & Checklists For HVAC Installation Testing & Commissioning Read More »

Method Statements, Testing & Commissioning
strapping the GRP pipes on trucks

GRP Pipe Installation and Lamination Method Statement

This procedure defines the work method for installation and lamination of GRP Pipe for any kind and size of the project. The purpose of this procedure is to set out the requirements and methods for installation of GRP glass reinforced plastic pipe including the lamination in detail. Below method statement shall be followed in compliance

GRP Pipe Installation and Lamination Method Statement Read More »

Civil Engineering Methods, Method Statements
access control system installation

Access Control System Installation

This access control system installation method statement provides steps for the installation of access control security system in order for operatives to understand the work to be executed, how it is to be executed while making references to other technical standards and relevant national/international standards. Method statement covers installation of ACS access control system including brackets,

Access Control System Installation Read More »

Electrical Method Statements, Method Statements
Method statement for Aluminium Windows and Doors Installation Including Glazing

Method statement for Aluminium Windows and Doors Installation Including Glazing

Below is a precise method statement for the installation of aluminium windows and doors including the glazing works. The method of statement describes the sequence of events from the receipt of the order through the completion of the Aluminium windows and doors related glazing work. All work will be carried out in accordance with project

Method statement for Aluminium Windows and Doors Installation Including Glazing Read More »

Aluminium & Glass Work Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Ceiling Spray Plaster Works Method Statement

Ceiling Spray Plaster Works Method Statement

Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment before starting the ceiling spray paint and spray plaster activities: Wire brush Skimmer

Ceiling Spray Plaster Works Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Occupational Health and Safety

Water Chiller Installation Method Statement

Below is a standard method statement or procedure which can be used for installation of water chiller on its foundation after it is delivered on the sites. Before starting the activity of chiller installation following tools/equipment shall be arranged: Tool Box Lifting Equipment (Cranes) Electric Drill Machine Ladders Threading Machine Welding/ Brazing Machine (if required)

Water Chiller Installation Method Statement Read More »

HVAC Method Statements, Method Statements
error: Content is protected !!
Scroll to Top