Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Occupational Health and Safety Procedure for Mobile Elevated Work Platform

Below is a precise procedure that provides instructions for the safe use of Mobile Elevated Work Platforms (EWP), applicable for all kind and size of projects. Overall project director and project HSE team is having responsibilities for the implementation of this occupational health and safety procedure and also relevant applicable standards i.e. ISO 16368:2024 – […]

Occupational Health and Safety Procedure for Mobile Elevated Work Platform Read More »

Construction Method Statements, Method Statements, Occupational Health and Safety, Risk Assessment

Method Statement for Testing & Commissioning of Foam System

Below is a precise foam system testing procedure that is applicable for testing and commissioning of foam fire suppression system. This page is not covering all sections of a complete method statement template but only operational sections. Before commissioning the foam system the following shall be ensured. Fire suppression system has been checked against the

Method Statement for Testing & Commissioning of Foam System Read More »

Fire Suppression System, Method Statements, Testing & Commissioning
Method Statement for Scaffolding, Formwork, Rebar Installation and Concreting

Method of Statement for Formwork, Rebar Installation and Concreting

Below is a precise civil work method of statement that covers the detailed procedure for the scaffolding / formwork, rebar installation and concreting operation applicable for footing, pedestals and pile caps etc. Also to explain how footing, pile caps, trenches, grade beam and grade slab work shall be carried out under controlled conditions. Tools &

Method of Statement for Formwork, Rebar Installation and Concreting Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Construction Methodology for Underground Services Protection

Construction Methodology for Underground Services Protection

Purpose of below safety method statement is to provide instructions for ensuring the safe operations involved with ground penetrations so that underground services are not damaged and also to ensure the safety of workers. Overall the project manager is having responsibilities for the implementation of this standard safety procedure. Hazard Identification and Risk Assessment a)

Construction Methodology for Underground Services Protection Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Plastering Method Statement

Plastering Method Statement

Below is a precise plastering work method statement that is very useful for civil engineers to understand how best quality plaster work can be done. This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project civil specifications. Below are the plastering tools or plastering equipment involved in

Plastering Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Flooring Installation Method Statement for Marble and Granite Tiles Installation

Flooring Installation Method Statement for Marble and Granite Tiles Installation

This flooring installation method statement covers the detailed procedure to be followed for supply & installation of Marble and Granite tiles on floor, stairs, walls and counters and other areas as per the schedule of finishes for the project. Civil site engineer shall ensure that all materials shall be delivered to site complying with approved

Flooring Installation Method Statement for Marble and Granite Tiles Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
HVAC Chilled Water Pump Installation Method Statement

HVAC Chilled Water Pump Installation Method Statement

Below is a precise hvac method statement that covers the CHW chilled water pump Installation Alignment and Balancing works applicable for any kind of mechanical project. Before start of work examine areas, equipment foundations, and conditions for compliance with requirements for installation and other conditions affecting chilled water pump performance. Do not proceed with pump

HVAC Chilled Water Pump Installation Method Statement Read More »

HVAC Method Statements
Emergency Lights Central Battery System Testing and Commissioning Method of Statement

Emergency Lighting Central Battery System Testing and Commissioning

This method of statement is to provide guidance in carrying out the testing and commissioning of central battery system which has been installed at the project, in accordance with the approved Project Quality Plan, contract specifications and Commissioning plan. Purpose of this method of statement is to control the testing and commissioning activities for the

Emergency Lighting Central Battery System Testing and Commissioning Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
error: Content is protected !!
Scroll to Top