Method Statement For Installation Of CCTV Camera Security System

Download CCTV System Installation Method Statement Package

Professional Method Statement for CCTV Camera Installation, Surveillance System Setup & ELV QA/QC Documentation Looking for a complete and consultant-approved CCTV System Installation Method Statement package? This professionally prepared documentation package is designed for ELV contractors, security system integrators, electrical contractors, QA/QC engineers and project teams involved in installation of CCTV (Closed Circuit Television) and […]

Download CCTV System Installation Method Statement Package Read More »

Electrical Method Statements

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF LABORATORY AIR FLOW CONTROL SYSTEM & VENTURI VALVES

 Download Package Contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in download package.  

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF LABORATORY AIR FLOW CONTROL SYSTEM & VENTURI VALVES Read More »

HVAC Method Statements, Testing & Commissioning
method statement for civil works

Construction Method Statement for Building Construction Project

Method statement for construction project is a mandatory requirement even sometimes at the pre-qualification stage of a construction contractor. Any reputable building construction company will follow best construction methods in order to provide best quality of work. Many old companies are always maintaining a good documentation system hence ensuring that the method statement for construction project

Construction Method Statement for Building Construction Project Read More »

Civil Works Method Statements

Download Chilled Water Cleaning, Flushing & Chemical Treatment Method Statement

Complete HVAC Flushing Procedure Package with ITP, QA/QC Checklists & Risk Assessment Download a professionally prepared Chilled Water Cleaning, Flushing & Chemical Treatment Method Statement package developed for HVAC contractors, MEP companies, commissioning engineers, QA/QC teams, and construction professionals involved in chilled water piping systems and HVAC plant commissioning. This editable document package provides complete

Download Chilled Water Cleaning, Flushing & Chemical Treatment Method Statement Read More »

HVAC Method Statements

Method Statement for Concrete Coring & Cutting

Before commencing any concrete coring and cutting activity on site, the client/consultants must be notified. All the related documents, shop drawings, method of statements, material approvals, subcontractor’s approvals and test certificates must be approved and readily available on the working location. Below mentioned tools and equipment shall be arranged. Cutting Machine – LP32/TS20 Coring Machine

Method Statement for Concrete Coring & Cutting Read More »

Civil Works Method Statements
Method Statement for Installation of Noise Control and Vibration Isolation Equipment

Method Statement for Installation of Noise Control and Vibration Isolation Equipment

This method statement covers on site installation of noise control and vibration isolator equipment associated with all rotating, centrifugal and reciprocating equipment i.e. pumps, chillers, air handling units and pipe connections etc. Procedure defines the steps that will be used to ensure the correct installation of noise control equipment to avoid excess noise and vibration

Method Statement for Installation of Noise Control and Vibration Isolation Equipment Read More »

HVAC Method Statements

Method Statement for Application Of Bitumen Paint

Below is the systematic procedures for the various activities required for application of Bitumen Paint to ensure that all works are carried out in accordance with manufacturer’s recommendations. Arrange approved construction drawings and project specifications before start of the work. Surface Preparation Procedure: Surface shall be clean, dry and free from loose particles before application

Method Statement for Application Of Bitumen Paint Read More »