Method Statement

Tensile Fabric Shades Fabrication and Installation Methodology

Below is a precise method statement that covers the fabrication and installation of fabric components of the tensile fabric shades that includes: Shades over outdoor playgrounds Shades over swimming pool Car park shades Fabric roof over cafeteria This procedure shall be read in conjunction with project specifications wherever applicable. Below is the equipment required for […]

Tensile Fabric Shades Fabrication and Installation Methodology Read More »

Civil Works Method Statements

LPG System Installation, Testing & Commissioning Method Statement

This mechanical method statement provides the details of site wide installation of LPG works for the project. Method statement also outlines the quality procedures for LPG works for the project. In addition this method statement is helpful to make the technicians aware of their exposure to the safety risk identified and explain them how to

LPG System Installation, Testing & Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning

Method Statement for Fire Alarm System Installation & Testing

Below is the method statement for the installation of fire alarm system which can be modified for different type of systems like HSSD or Vesda etc. This method also covers testing and commissioning fire alarm system. The steps are very general and should be customized depending upon the project specific requirements, specifications and applicable NFPA

Method Statement for Fire Alarm System Installation & Testing Read More »

Fire Suppression System, Testing & Commissioning
Method Statement For Installation of Galvanized Wire Mesh/Screen

Method Statement For Installation of Galvanized Wire Mesh/Screen

The purpose of this procedure is to define how wire screen /mesh installation works shall be carried out under controlled condition. This Method Statement describes the steps that will be followed for the installation of galvanized mesh / screen as per the approved shop drawing details, this procedure shall be read in conjunction with contract

Method Statement For Installation of Galvanized Wire Mesh/Screen Read More »

Civil Works Method Statements

Refrigerant Piping Installation and Pressure Testing Method of Statement

Below is the detailed procedure for the installation of refrigerant piping which can be applicable for any kind of air conditioning works or ac copper pipe. Below is list of necessary tool requirements for installation and testing of refrigerant piping works. Health and Safety Requirements Make sure that all concerned personnel shall use PPE (Personal

Refrigerant Piping Installation and Pressure Testing Method of Statement Read More »

HVAC Method Statements

Download Method Statement For Installation of Laboratory Plume Fans & Energy Recovery Coil Integrated System

 This method statement covers the receiving, handling, storage, installation, inspection, identification, and pre-commissioning verification of laboratory plume fans used in laboratory exhaust systems. The scope includes all mechanical, structural, electrical, control, vibration isolation, and ductwork interface activities associated with induced-flow and high-plume dilution exhaust fan systems. Download Package Contains the Method Statement + Checklists for

Download Method Statement For Installation of Laboratory Plume Fans & Energy Recovery Coil Integrated System Read More »

HVAC Method Statements
soft landscaping method statement

Soft landscaping method statement

This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel Crane Personal Protective Equipment: Safety Shoes Safety Helmets Hand Gloves Goggles Method Statement

Soft landscaping method statement Read More »

Civil Works Method Statements