Method Statement

Method Statement For Installation of Galvanized Wire Mesh/Screen

Method Statement For Installation of Galvanized Wire Mesh/Screen

The purpose of this procedure is to define how wire screen /mesh installation works shall be carried out under controlled condition. This Method Statement describes the steps that will be followed for the installation of galvanized mesh / screen as per the approved shop drawing details, this procedure shall be read in conjunction with contract […]

Method Statement For Installation of Galvanized Wire Mesh/Screen Read More »

Method Statement for Civil Works

Refrigerant Piping Installation and Pressure Testing Method of Statement

Below is the detailed procedure for the installation of refrigerant piping which can be applicable for any kind of air conditioning works or ac copper pipe. Below is list of necessary tool requirements for installation and testing of refrigerant piping works. Health and Safety Requirements Make sure that all concerned personnel shall use PPE (Personal

Refrigerant Piping Installation and Pressure Testing Method of Statement Read More »

HVAC Method Statements, Pressure Testing

Download Method Statement For Installation of Laboratory Plume Fans & Energy Recovery Coil Integrated System

 This method statement covers the receiving, handling, storage, installation, inspection, identification, and pre-commissioning verification of laboratory plume fans used in laboratory exhaust systems. The scope includes all mechanical, structural, electrical, control, vibration isolation, and ductwork interface activities associated with induced-flow and high-plume dilution exhaust fan systems. Download Package Contains the Method Statement + Checklists for

Download Method Statement For Installation of Laboratory Plume Fans & Energy Recovery Coil Integrated System Read More »

HVAC Method Statements
Method Statement For Installation Of CCTV Camera Security System

Download CCTV System Installation Method Statement Package

Professional Method Statement for CCTV Camera Installation, Surveillance System Setup & ELV QA/QC Documentation Looking for a complete and consultant-approved CCTV System Installation Method Statement package? This professionally prepared documentation package is designed for ELV contractors, security system integrators, electrical contractors, QA/QC engineers and project teams involved in installation of CCTV (Closed Circuit Television) and

Download CCTV System Installation Method Statement Package Read More »

Electrical Method Statements

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF LABORATORY AIR FLOW CONTROL SYSTEM & VENTURI VALVES

 Download Package Contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in download package.  

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF LABORATORY AIR FLOW CONTROL SYSTEM & VENTURI VALVES Read More »

HVAC Method Statements, Testing & Commissioning
method statement for civil works

Construction Method Statement for Building Construction Project

Method statement for construction project is a mandatory requirement even sometimes at the pre-qualification stage of a construction contractor. Any reputable building construction company will follow best construction methods in order to provide best quality of work. Many old companies are always maintaining a good documentation system hence ensuring that the method statement for construction project

Construction Method Statement for Building Construction Project Read More »

Method Statement for Civil Works

Download Chilled Water Cleaning, Flushing & Chemical Treatment Method Statement

Complete HVAC Flushing Procedure Package with ITP, QA/QC Checklists & Risk Assessment Download a professionally prepared Chilled Water Cleaning, Flushing & Chemical Treatment Method Statement package developed for HVAC contractors, MEP companies, commissioning engineers, QA/QC teams, and construction professionals involved in chilled water piping systems and HVAC plant commissioning. This editable document package provides complete

Download Chilled Water Cleaning, Flushing & Chemical Treatment Method Statement Read More »

HVAC Method Statements

Method Statement for Concrete Coring & Cutting

Before commencing any concrete coring and cutting activity on site, the client/consultants must be notified. All the related documents, shop drawings, method of statements, material approvals, subcontractor’s approvals and test certificates must be approved and readily available on the working location. Below mentioned tools and equipment shall be arranged. Cutting Machine – LP32/TS20 Coring Machine

Method Statement for Concrete Coring & Cutting Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements
Method Statement for Installation of Noise Control and Vibration Isolation Equipment

Method Statement for Installation of Noise Control and Vibration Isolation Equipment

This method statement covers on site installation of noise control and vibration isolator equipment associated with all rotating, centrifugal and reciprocating equipment i.e. pumps, chillers, air handling units and pipe connections etc. Procedure defines the steps that will be used to ensure the correct installation of noise control equipment to avoid excess noise and vibration

Method Statement for Installation of Noise Control and Vibration Isolation Equipment Read More »

Construction Method Statements, Method Statements