Measurement of Structural excavation will be limited to excavation for foundation for bridges, retaining walls, box culverts or cross sectional area exceeding 1 sq. mtr, box culvert wing walls, head walls, toe walls and aprons, manholes, pump houses and sub-stations. For box
Read Complete Method
Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench
Read Complete Method
Project starts from project mobilization. Once you win the project and client asks you to move your team you need certain documents for submission and approval. Site mobilization method statement is one of such requirement. Now a days most of the government
Read Complete Method
Chilled Water Automatic control valves 2″ and smaller shall be screwed type, of red brass material and valves 2½” and larger shall be cast iron type and flanged. Valves shall be ANSI- rated to withstand the pressures and temperatures encountered. Valves shall
Read Complete Method
The system shall be capable of integration with other building services level by simple hardware (electrical) methods or by the use of a computer-based communications protocol. Where a communications protocol is used, integration controllers shall provide this facility and shall be capable
Read Complete Method
Generally any energy management control software shall provide as a minimum the following functions. Each function is detailed separately. Time Control Modes There shall be no limit to the number of time schedules each of which can have any point or number
Read Complete Method