Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Electrical Switchgear Installation Method Statement for 11KV HV Panel

Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning

The purpose of this electrical method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant ATS operators manual and User’s guide. By following this procedure contractor shall ensure that the method used for testing and

Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Underground Piping Fabrication and Laying Method Statement

Purpose of this mechanical work procedure is to provide guide lines to carry out underground piping fabrication and laying and to ensure that proper quality control and documentation are maintained at project site. The scope of this procedure covers fabrication, installation and relevant inspection for all underground piping works including relevant civil works at the

Underground Piping Fabrication and Laying Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Pressure Testing, Roadworks
Installation Testing & Commissioning Of BMS Building Management System

Building Management System BMS Installation Testing and Commissioning Method Statement

Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site, installation, testing & commissioning of the BMS system as described in the project

Building Management System BMS Installation Testing and Commissioning Method Statement Read More »

Building Management System, HVAC Method Statements, Method Statements, Testing & Commissioning
method statement for electrical wiring installation

METHOD STATEMENT FOR INSTALLATION OF WIRING DEVICES & CEILING ROSE

The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for installation of wiring devices & ceiling rose for electrical system through the guidelines contained herein so as to ensure that the job execution complies with the requirements of contract specification and serves the intended

METHOD STATEMENT FOR INSTALLATION OF WIRING DEVICES & CEILING ROSE Read More »

Electrical Method Statements, Method Statements

Method Statement for Piping Fabrication and Installation

This document covers the sequence of activities for Fabrication, Erection and Installation procedure for Metallic Piping (Carbon Steels, Stainless Steels, Nickel Alloys) systems and to ensure the compliance to the above activities with the contractual applications, applicable standards and HSE requirements. Below is list of necessary equipment’s and tools for the piping fabrication and installation

Method Statement for Piping Fabrication and Installation Read More »

Civil Engineering Methods, Method Statements, Occupational Health and Safety, Stainless Steel Fabrication

Download Method Statement For Internal Painting Works

Download Method Statement For Internal Painting Works  Download Package Contains the Method Statement + Checklists for Painting + Inspection & Testing Plan + Risk Assessment  You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in

Download Method Statement For Internal Painting Works Read More »

Method Statement for Civil Works
Roof Cladding Wall Cladding Method Statement

Roof Cladding | Wall Cladding Method Statement

Below is a precise method statement for installation of insulated roof cladding and wall cladding installation. List of necessary plant, machinery, materials and tools: Lifting Equipment 50 ton mobile crane (2 No.) 25 ton mobile crane (4 No.) 3 ton telescopic boom loader Scaffoldings Man lift Electrical equipment Generator Drill (110 volts) Screw gun Electrical

Roof Cladding | Wall Cladding Method Statement Read More »

Aluminium & Glass Work Methods, Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements