HVAC Method Statements

Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

installation-of-Industrial-Exhaust-Fans

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans)

Below is a precise exhaust fan installation procedure that covers installation of Axial, Centrifugal and Propeller types of exhaust fans. This standing procedure step wise defines the method that will help to ensure that installation of axial / centrifugal / propeller fan’s, supports, vibration isolators and final connections is done as per project specifications. Also

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans) Read More »

Duct Works, HVAC Method Statements
Method of thermal insulation and Lagging for Pipe Elbow

Method Statement for Installation of Thermal Insulation on Pipes

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause corrosion problems or process problems, for example the outdoor piping, fitting and equipment.

Method Statement for Installation of Thermal Insulation on Pipes Read More »

HVAC Method Statements, Method Statements

Kitchen Exhaust Ducting Installation Method Statement

This method statement covers on site installation of pre-fabricated ductwork system for kitchen exhaust ducting. Procedure defines the method that will make sure that prefabricated kitchen exhaust ducting including support/bracketing, in line equipment installation and final connections are correct and acceptable, and conforms to the contract documents and specifications. Construction/ Project Manager is overall responsible

Kitchen Exhaust Ducting Installation Method Statement Read More »

HVAC Method Statements, Method Statements
Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Method Statement for Testing & Commissioning of Air Handling Units AHU & FAHU

This page presents precise mechanical method statement that covers ahu testing and commissioning procedure. A full method statement shall have many other sections and details depending upon the type and size of units and projects.  Prior to testing & commissioning ensure that all the sections of the Air Handling Units are thoroughly cleaned. In case

Method Statement for Testing & Commissioning of Air Handling Units AHU & FAHU Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning

Chilled Water Pipe Insulation Method Statement

1. Purpose This method statement covers on site installation of thermal insulation for the complete chilled water piping system. 2. Scope This procedure is applicable for insulation of all supply and return mains, headers, branches, risers, drips, run-outs, pump suction and discharge, pipework, fittings, flanges, valves, expansion and movement devices, flexible connections associated with the

Chilled Water Pipe Insulation Method Statement Read More »

HVAC Method Statements

Piping Installation, Welding & Fabrication Method Statement

TABLE OF CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESOURCES RESPONSIBILITIES SEQUNCE OF WORKS QA/QC REQUIREMENTS HSE REQUIMENTS EMERANCY CONTACTS Purpose: The purpose of this methodology is to provide a systematic control and direction for the activity for the installation of piping at a construction site. This method statement provides the expectation to execute work in safe,

Piping Installation, Welding & Fabrication Method Statement Read More »

HVAC Method Statements, Stainless Steel Fabrication