HVAC Method Statements

Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

Method of thermal insulation and Lagging for Pipe Elbow

Method Statement for Installation of Thermal Insulation on Pipes

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause corrosion problems or process problems, for example the outdoor piping, fitting and equipment. […]

Method Statement for Installation of Thermal Insulation on Pipes Read More »

Duct Works, HVAC Method Statements, Method Statements, Technical Articles
45° Elbow to Pipe Fit Up

Pipe Welding Work and the Welder’s Qualification Test Procedure

Below method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes implementing the company commitments for achieving the best quality of welding works. The document outlines the method for executing welding process for pipe work and welding procedure qualification test for welders. This method statement covers

Pipe Welding Work and the Welder’s Qualification Test Procedure Read More »

HVAC Method Statements, Plumbing Method Statements, Stainless Steel Fabrication
Ventilation Fans Installation Method Statement

Ventilation Fan Installation Method Statement

This document applies to the inward site inspection, installation and inspection methods to be adopted for the ventilation fan installation. After receiving on the project site, ventilation fans shall be stored in a clean / dry place and adequate covering by tarpaulin sheets to be provided to protect the equipment from deposition of construction dust

Ventilation Fan Installation Method Statement Read More »

HVAC Method Statements, Method Statements
Fan Powered Box FPB installation method

Method Statement for Installation of Fan Powered Box Units

Unless otherwise specified, all installation shall be in accordance to approved shop drawings and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Fan Powered Box units. Install Fan Powered Box as indicated unless deviations to layout are approved on coordination drawings. Transfer the Fan Powered Box units from the stores

Method Statement for Installation of Fan Powered Box Units Read More »

Duct Works, HVAC Method Statements, Method Statements

Method Statement For Testing & Commissioning Of Cooling Towers

The scope of this method statement is to determine the thermal capability of water cooling towers. Its main purpose is to describe instrumentation and procedures for the testing and performance evaluation of water cooling towers. It is recognized that the data limitations specified throughout this Testing & Commissioning Procedure represent desired conditions which may not

Method Statement For Testing & Commissioning Of Cooling Towers Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery

Below sequence of operation is for Variable Volume Type FAHU with Plate Heat Recovery system. The system shall be variable volume package Fresh Air Handling Unit. The scope of the unit shall consist of: Supply Side accessories Intake motorized damper Panel (Pleated) Filter Bag Filter Cooling Coil Supply Fan (with VFD) Plate Heat Exchanger Intake and discharge

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery Read More »

Building Management System, HVAC Method Statements, Testing & Commissioning

Method Statement for Installation of GI Ducts for HVAC System

This mechanical hvac method statement covers the installation of GI ductwork. Procedure defines the method used to ensure GI ducting installation has been carried out as per contract requirements and best practices. The method statement gives details of how the work will be carried out and what health and safety issues and controls are involved.

Method Statement for Installation of GI Ducts for HVAC System Read More »