Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Method statement for Aluminium Windows and Doors Installation Including Glazing

Method statement for Aluminium Windows and Doors Installation Including Glazing

Below is a precise method statement for the installation of aluminium windows and doors including the glazing works. The method of statement describes the sequence of events from the receipt of the order through the completion of the Aluminium windows and doors related glazing work. All work will be carried out in accordance with project […]

Method statement for Aluminium Windows and Doors Installation Including Glazing Read More »

Aluminium & Glass Work Methods, Civil Works Method Statements
Ceiling Spray Plaster Works Method Statement

Ceiling Spray Plaster Works Method Statement

Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment before starting the ceiling spray paint and spray plaster activities: Wire brush Skimmer

Ceiling Spray Plaster Works Method Statement Read More »

Civil Works Method Statements
Lifting Operations Method of Statement Download

Download Lifting Operations Standard Method Statement in editable MS Word Format

Download Lifting Operations Standard Method Statement in editable MS Word format with all necessary forms and formats. You only need to add your company logo and project details etc. and your safety document is ready for submission and approval from client/consultant. This standard lifting activity instruction outlines the minimum requirements for the use, operation and

Download Lifting Operations Standard Method Statement in editable MS Word Format Read More »

Civil Works Method Statements, Occupational Health and Safety, Risk Assessment
Installation method statement for Curtain Wall

Installation of Glazed Aluminum Curtain Wall & Composite Cladding

You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be obtained and site dimensions shall be verified before start of any activities on

Installation of Glazed Aluminum Curtain Wall & Composite Cladding Read More »

Aluminium & Glass Work Methods, Civil Works Method Statements

Civil Method Statement for RCC Columns and Shear Wall Construction

Below is a general method statement for illustrative purpose, there shall be different values for different parameters depending upon the type of project and climatic situations, which should be followed all the time. EQUIPMENT’S & TOOLS REQUIRED Hand saw, wire cutter, brush, Shovel Steel Brush Air compressor Plumb bob Line dory Concrete Pump Vibrator Trowel Spirit

Civil Method Statement for RCC Columns and Shear Wall Construction Read More »

Civil Works Method Statements
application heads for weld seam coating

Method Statement for Bituseal Enamel application

The Bituseal Enamel is based on a specially selected bitumen, modified with high performance engineering polymers. This polymer modification ensures improvements of a number of the product’s qualities, e.g. flexibility, adhesion and durability. Bituseal Enamel is supplied in different types/grades, depending on the varying requirements for corrosion protection materials for pipelines. The key factor in

Method Statement for Bituseal Enamel application Read More »

Civil Works Method Statements
Method Statement for Scaffolding, Formwork, Rebar Installation and Concreting

Method of Statement for Formwork, Rebar Installation and Concreting

Below is a precise civil work method of statement that covers the detailed procedure for the scaffolding / formwork, rebar installation and concreting operation applicable for footing, pedestals and pile caps etc. Also to explain how footing, pile caps, trenches, grade beam and grade slab work shall be carried out under controlled conditions. Tools &

Method of Statement for Formwork, Rebar Installation and Concreting Read More »