Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Construction Methodology for Underground Services Protection

Construction Methodology for Underground Services Protection

Purpose of below safety method statement is to provide instructions for ensuring the safe operations involved with ground penetrations so that underground services are not damaged and also to ensure the safety of workers. Overall the project manager is having responsibilities for the implementation of this standard safety procedure. Hazard Identification and Risk Assessment a) […]

Construction Methodology for Underground Services Protection Read More »

Civil Works Method Statements
Flooring Installation Method Statement for Marble and Granite Tiles Installation

Flooring Installation Method Statement for Marble and Granite Tiles Installation

This flooring installation method statement covers the detailed procedure to be followed for supply & installation of Marble and Granite tiles on floor, stairs, walls and counters and other areas as per the schedule of finishes for the project. Civil site engineer shall ensure that all materials shall be delivered to site complying with approved

Flooring Installation Method Statement for Marble and Granite Tiles Installation Read More »

Civil Works Method Statements
Cathodic Protection System for Storage Tanks Installation Method Statement

Storage Tank Fabrication Erection and Testing Method Statement

This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in accordance with the project specifications to achieve satisfactory completion of the whole process.

Storage Tank Fabrication Erection and Testing Method Statement Read More »

Civil Works Method Statements, Steel Structure & Fabrication
Demolition-Method-Statement

Method Statement for Demolition Works

Below is precise method statement for demolition works that has been prepared to demonstrate the safe working method for the soft strip of internal fixtures/fixings and identified items, asbestos removal and demolition of the existing structure. This safework method is to be read in conjunction with provided drawings and Hazard surveys. This method statement is

Method Statement for Demolition Works Read More »

Civil Works Method Statements

Download Method Statement for Anti Termite Treatment

Download Method Statement for Anti Termite Treatment  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included

Download Method Statement for Anti Termite Treatment Read More »

Civil Works Method Statements
Method of Statement for Protection Screed of Waterproofing Membrane

Download Method Statement for Water Proofing Sub Structure

Professional Substructure Water Proofing Method Statement Ensure leak-free construction and consultant-approved waterproofing works with this professionally prepared Substructure Water Proofing Method Statement package. This complete documentation package is designed for contractors, waterproofing specialists, QA/QC engineers and project teams handling residential, commercial and industrial waterproofing applications. The package includes all required procedures, quality forms, inspection documents

Download Method Statement for Water Proofing Sub Structure Read More »

Civil Works Method Statements
error: Content is protected !!
Scroll to Top