Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Total Station Surveying

Case Study – Total Station Surveying and Topography

A project site was used as a case study mainly to highlight the importance of anticipating the presence of hard materials on site and the associated problems if hard materials are detected during construction work. The study was undertaken alongside the remained hilly terrain. The original hills have been leveled down to the required reduced […]

Case Study – Total Station Surveying and Topography Read More »

Civil Works Method Statements, Technical Articles

Download Method Statement For Internal Painting Works

Editable Method Statement, ITP, QA/QC Checklists & Risk Assessment Package Download a professionally prepared Internal Painting Works Method Statement package developed for contractors, consultants, QA/QC engineers, and construction professionals involved in residential, commercial, industrial, and infrastructure projects. This ready-to-use document package provides complete procedures for surface preparation, primer application, putty works, painting execution, inspection, testing,

Download Method Statement For Internal Painting Works Read More »

Civil Works Method Statements
Roof Cladding Wall Cladding Method Statement

Roof Cladding | Wall Cladding Method Statement

Below is a precise method statement for installation of insulated roof cladding and wall cladding installation. List of necessary plant, machinery, materials and tools: Lifting Equipment 50 ton mobile crane (2 No.) 25 ton mobile crane (4 No.) 3 ton telescopic boom loader Scaffoldings Man lift Electrical equipment Generator Drill (110 volts) Screw gun Electrical

Roof Cladding | Wall Cladding Method Statement Read More »

Civil Works Method Statements
excavation for pond construction

Civil Method Statement for Pond Work

This civil Method Statement defines the procedure to carry out the pond work as per requirements in project specifications to ensure the safety and quality of the work. Method statement covers excavation activity, rebar installation, formworks, concrete pouring, curing of concrete, formwork dismantling, finishing, and other civil work base on civil work item list. Subcontractor

Civil Method Statement for Pond Work Read More »

Civil Works Method Statements
Method statement for Aluminium Windows and Doors Installation Including Glazing

Method statement for Aluminium Windows and Doors Installation Including Glazing

Below is a precise method statement for the installation of aluminium windows and doors including the glazing works. The method of statement describes the sequence of events from the receipt of the order through the completion of the Aluminium windows and doors related glazing work. All work will be carried out in accordance with project

Method statement for Aluminium Windows and Doors Installation Including Glazing Read More »

Aluminium & Glass Work Methods, Civil Works Method Statements
Ceiling Spray Plaster Works Method Statement

Ceiling Spray Plaster Works Method Statement

Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment before starting the ceiling spray paint and spray plaster activities: Wire brush Skimmer

Ceiling Spray Plaster Works Method Statement Read More »

Civil Works Method Statements
Lifting Operations Method of Statement Download

Download Lifting Operations Standard Method Statement in editable MS Word Format

Download Lifting Operations Standard Method Statement in editable MS Word format with all necessary forms and formats. You only need to add your company logo and project details etc. and your safety document is ready for submission and approval from client/consultant. This standard lifting activity instruction outlines the minimum requirements for the use, operation and

Download Lifting Operations Standard Method Statement in editable MS Word Format Read More »

Civil Works Method Statements, Occupational Health and Safety, Risk Assessment