Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

backfill method statement

Method of Soil Backfill of Trenches

This method statement describes a proper work procedure shall be carried out during the backfill Work of soil. Earthwork forms a part of the installation procedures of box culverts, retaining walls, foundations, and substructures. In order to ensure an adequate foundation for such structures, backfill material must meet certain specifications and be compacted by acceptable methods […]

Method of Soil Backfill of Trenches Read More »

Civil Works Method Statements
Safework Method of Statement for Production & Erection of Precast Concrete Boundary Wall Panel

RCC Precast Boundary Wall Method Statement

Below is a precise method statement for the rcc precast boundary wall construction and installation as per project specifications and approved drawings. Quality requirements shall be complied during all activities as per project quality plan, specifications and approved method statements. List of Equipment’s Below is list of necessary plant and equipment for precast boundary wall

RCC Precast Boundary Wall Method Statement Read More »

Civil Works Method Statements
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing

The purpose of this method statement for reinforcement works is to lay down the systematic procedures for the various activities required for installation of reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings, bar bending schedule and project specifications. This method of statement covers the general procedures

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing Read More »

Civil Works Method Statements
Total Station Surveying

Case Study – Total Station Surveying and Topography

A project site was used as a case study mainly to highlight the importance of anticipating the presence of hard materials on site and the associated problems if hard materials are detected during construction work. The study was undertaken alongside the remained hilly terrain. The original hills have been leveled down to the required reduced

Case Study – Total Station Surveying and Topography Read More »

Civil Works Method Statements, Technical Articles

Download Method Statement For Internal Painting Works

Editable Method Statement, ITP, QA/QC Checklists & Risk Assessment Package Download a professionally prepared Internal Painting Works Method Statement package developed for contractors, consultants, QA/QC engineers, and construction professionals involved in residential, commercial, industrial, and infrastructure projects. This ready-to-use document package provides complete procedures for surface preparation, primer application, putty works, painting execution, inspection, testing,

Download Method Statement For Internal Painting Works Read More »

Civil Works Method Statements
Roof Cladding Wall Cladding Method Statement

Roof Cladding | Wall Cladding Method Statement

Below is a precise method statement for installation of insulated roof cladding and wall cladding installation. List of necessary plant, machinery, materials and tools: Lifting Equipment 50 ton mobile crane (2 No.) 25 ton mobile crane (4 No.) 3 ton telescopic boom loader Scaffoldings Man lift Electrical equipment Generator Drill (110 volts) Screw gun Electrical

Roof Cladding | Wall Cladding Method Statement Read More »

Civil Works Method Statements
excavation for pond construction

Civil Method Statement for Pond Work

This civil Method Statement defines the procedure to carry out the pond work as per requirements in project specifications to ensure the safety and quality of the work. Method statement covers excavation activity, rebar installation, formworks, concrete pouring, curing of concrete, formwork dismantling, finishing, and other civil work base on civil work item list. Subcontractor

Civil Method Statement for Pond Work Read More »