Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Method Statement for Swimming Pool and Jacuzzi Installation

Method Statement for Swimming Pool and Jacuzzi Installation

This construction methodology for the swimming pool and jacuzzi installation consists of descriptive details and the installation sequence for guiding the employees of a pool installation company. Scope of work covers the supply and installation of the Swimming Pool and Jacuzzi. All materials used are in accordance with contract specifications and shall be submitted for […]

Method Statement for Swimming Pool and Jacuzzi Installation Read More »

Civil Works Method Statements
dewatering in construction well point system

Well Point Dewatering System Method Statement

The purpose of this method statement is to define the procedure for sequence of works for dewatering in construction works at site to complete the excavation from the existing levels down to the formation level considering all safety and quality requirements. This method statement covers dewatering works at construction site having 6 meter basement structure,

Well Point Dewatering System Method Statement Read More »

Civil Works Method Statements

Mobile Heavy Equipment Recovery Standard Procedure

The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use of heavy mobile recovery equipment, although some of the general safety principles may

Mobile Heavy Equipment Recovery Standard Procedure Read More »

Civil Works Method Statements, Roadworks
Cathodic Protection System for Storage Tanks Installation Method Statement

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the best quality workmanship for the scope of work. All project site, QA/QC and

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure Read More »

Civil Works Method Statements
Method of Statement for Protection Screed of Waterproofing Membrane

Method of Statement for Protection Screed of Waterproofing Membrane

This civil work method statement describes the brief procedure and responsibilities of site personnel who are involved in the work for protection screed of waterproofing membrane. Project manager is overall responsible for the implementation of this method during the project civil works related to Screeding works. The site engineers are responsible for proper execution, arrangement,

Method of Statement for Protection Screed of Waterproofing Membrane Read More »

Civil Works Method Statements

Method of Statement for Good Housekeeping in Construction Site

This standard document provides guidance on how to maintain a tidy place of work, free from avoidable hazards and an orderly working environment. Scope of the procedure covers all projects under the supervision of the organization. Project head along with discipline engineers including HSE are overall responsible for the implementation of this housekeeping method. Good

Method of Statement for Good Housekeeping in Construction Site Read More »

Civil Works Method Statements, Occupational Health and Safety
Roof Trusses Fabrication swms

Roof Trusses Fabrication Safe Work Method Statement SWMS

The sub-contractor or person doing the work is responsible for carrying out a particular action, as listed in this safe work method statement SWMS. The supervisor is responsible to ensure that the sub-contractor or person doing the work is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the

Roof Trusses Fabrication Safe Work Method Statement SWMS Read More »

Civil Works Method Statements, Steel Structure & Fabrication