Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Construction site mobilization

Construction Project Site Mobilization Method Statement

Project starts from project mobilization. Once you win the project and client asks you to move your team you need certain documents for submission and approval. Site mobilization method statement is one of such requirement. Now a days most of the government entities require that all contractors must submit a plan which details how mobilization […]

Construction Project Site Mobilization Method Statement Read More »

Civil Works Method Statements

Method Statement for Application Of Bitumen Paint

Below is the systematic procedures for the various activities required for application of Bitumen Paint to ensure that all works are carried out in accordance with manufacturer’s recommendations. Arrange approved construction drawings and project specifications before start of the work. Surface Preparation Procedure: Surface shall be clean, dry and free from loose particles before application

Method Statement for Application Of Bitumen Paint Read More »

Civil Works Method Statements
Bored Pile (Cast-in-Situ) Construction Method Statement

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated risks involved, develop and implement adequate control measures and to provide a safe

Bored Pile (Cast-in-Situ) Construction Method Statement Read More »

Civil Works Method Statements

Precast Post Tensioned Beam Installation Procedure

This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information. The prestressing systems is STRONG FORCE (M) Multi Strand Bonded System using 15.24mm

Precast Post Tensioned Beam Installation Procedure Read More »

Civil Works Method Statements

Method Statement for Gypsum Board Ceiling

A dropped ceiling or false ceiling is a secondary ceiling, hung below the main (structural) ceiling. It may also be referred to as a drop ceiling, T-bar ceiling, false ceiling, suspended ceiling, grid ceiling, drop in ceiling, or drop out ceiling and is a staple of modern construction and architecture in both residential and commercial applications. How

Method Statement for Gypsum Board Ceiling Read More »