UV Sterilization System Testing and Commissioning Method Statement

Ultraviolet UV Sterilization System are useful in many water purification systems to disinfect and control bacteria. Ultraviolet or UV energy is found in the electromagnetic spectrum between visible light and x-rays and can best be described as invisible radiation. UV light occurs with a wavelength ranging from 200 to 390 nanometers (nm). The most effective […]

UV Sterilization System Testing and Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning

Pre Action System Testing and Commissioning Method Statement

Following tools shall be arranged before starting the testing and commissioning of pre action system. Valve opening keys Screw drivers Smoke agent Digital multi meter Communication Devices Pre-Commissioning Checks Before commissioning the system the following shall be ensured: The system has been checked against the approved installation drawings. The pressure testing or the pipes arc

Pre Action System Testing and Commissioning Method Statement Read More »

Fire Suppression System
Diesel-Generator-Genset Mobilization Method

Method Statement for Mobilization of Diesel Generator Genset

Step 1: Electrical Circuit Isolation Isolate the main electrical connections and supply line from the gen-set. Cut off the main circuit breaker of the generator control panel to “stop”. Disconnect the electrical batteries connection from the genset. Disconnect the grounding cable from the battery. Step 2: Dismantling of Radiator Exhaust Ducts Mark the mating parts

Method Statement for Mobilization of Diesel Generator Genset Read More »

Electrical Method Statements
horizontal-bladder-tank-installation Method Statement

Method Statement for Horizontal Four Flange Bladders Installation in Tank

Visually inspect bladder for correct size and obvious defects such as perforations before starting. Lay bladder on a dry, clean surface such as a cleanly swept floor, tarp, etc. Smooth out all wrinkles and folds. Roll up the small flange necks at top and bottom of bladder, the use duct tape to tape securely so that they

Method Statement for Horizontal Four Flange Bladders Installation in Tank Read More »

Fire Suppression System
domestic water treatment

Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation

Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings and BOQ related to the area of installation and ensure that required

Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation Read More »

Plumbing Method Statements

Car Parking Management System Testing Commissioning Procedure

Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety rules. System units may be used only for their intended purpose, as specified

Car Parking Management System Testing Commissioning Procedure Read More »

Electrical Method Statements, Testing & Commissioning

Bypass Terminal Reheat Units Testing & Commissioning Method

Pre-Commissioning Procedure Before starting the commissioning activities check and ensure that bypass Terminal Reheat units are installed as per the approved shop drawings and manufacturer’s instructions and approved. Check that sensing grids tubing connection from the grids to the transducers are correct & secure. Check for proper mounting of the actuator on the body of

Bypass Terminal Reheat Units Testing & Commissioning Method Read More »

HVAC Method Statements, Testing & Commissioning