Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight […]

Drainage Pipe Installation & Hydrostatic Testing Method of Statement Read More »

Plumbing Method Statements

Method Statement for Installation of GI Ducts for HVAC System

This mechanical hvac method statement covers the installation of GI ductwork. Procedure defines the method used to ensure GI ducting installation has been carried out as per contract requirements and best practices. The method statement gives details of how the work will be carried out and what health and safety issues and controls are involved.

Method Statement for Installation of GI Ducts for HVAC System Read More »

HVAC Method Statements
Project Manager Responsibilities

PMC Project Manager Roles & Responsibilities

TYPICAL PROJECT RESPONSIBILITIES FOR A PROJECT MANAGEMENT COMPANY: THE PROJECT MANAGER The Project Manager shall perform the Services strictly in accordance with the skill, care and diligence reasonably to the expected of a professional international project management consultant experienced in the provision of like services with due regard to protecting and representing the Client’s interests.

PMC Project Manager Roles & Responsibilities Read More »

Quality & Project Management, Technical Articles
method statement for Cementitious Water proofing

Method Statement for Cementitious and Reactive Waterproofing Works

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities for Cementitious and Reactive Waterproofing for Floor and Walls of Evaporator pits, Electrical Cable Trenches, Sump Pits and other locations as shown on

Method Statement for Cementitious and Reactive Waterproofing Works Read More »

Civil Works Method Statements
quality assurance surveillance plan

Quality Assurance Surveillance Plan Basic Implementation Steps

Quality assurance surveillance plan is an important plan that is meant to ensure conformance to the performance statement of work. This plan is beneficial for the clients and government agencies. Because QASP conforms whether the deliverables from contractors are according to the set standards. QASP also ensures that all parties are agree upon while giving

Quality Assurance Surveillance Plan Basic Implementation Steps Read More »

Quality & Project Management, Technical Articles
error: Content is protected !!
Scroll to Top