QHSE Meaning and Evolution of Quality, Health, Safety and Environmental Management Systems

QHSE is the term famous for the two professions collectively and in fact for four areas or roles i.e. Quality, Health, Safety and Environment or environmental. In some industries the security is also part of QHSE where it is abbreviated as QHSSE. In addition you may observe the terms HSEQ, QSHE, SHEQ which in fact

QHSE Meaning and Evolution of Quality, Health, Safety and Environmental Management Systems Read More »

Occupational Health and Safety, Quality Management, Technical Articles
Method Statement for Oil Storage Tanks Calibration

Method Statement for Oil Storage Tanks Calibration

Tank Calibration is the process of determining the volumetric content of a tank per unit height of liquid. This procedure shall be intended for calibration of Oil Storage Tanks. The calibration shall be carried out by Optical Reference Line Method (ORLM) in accordance with API Standards i.e.  API 2550, Section 2B and ISO 7507, Part 2. Condition for Measurements

Method Statement for Oil Storage Tanks Calibration Read More »

Civil Engineering Methods, Method Statement for Civil Works, Technical Articles
Installation Method Statement for Settling Tank Shells Using Jack Lifting Method

Hydro and Water Fill Up Test for Settling Tanks

This test procedure shall be carried out to detect the leak in shell weld joints and to observe the load stabilization of liquid in interval level height. During the hydro test, all instrumentation shall be excluded to avoid the damage to instruments. Since the hydro test is to be carried out by produced water, ensure

Hydro and Water Fill Up Test for Settling Tanks Read More »

Civil Engineering Methods, Method Statement for Civil Works
Installation of Fencing

Method Statement for Installation of Fencing

Following Plant & Equipment to be arranged for the project fencing work. Tracked excavator Tractor and trailer Post driver Chainsaw Small tools (hammers, nail guns, wire cutters etc.) All personnel entering the site shall have received site safety induction and have attended a job toolbox talk. The Fencing Site Engineer will issue a Permit to Dig

Method Statement for Installation of Fencing Read More »

Civil Engineering Methods, Method Statement for Civil Works

Method Statement For Spool Fabrication Of Steel Piping

The spool fabrication will be implemented with the sequence of marking, cutting, fit-up, welding, and painting. Marking All materials shall be marked for identification and traceability with respect to installation area, sheet number and spool number. The cut pipe spools shall be marked with their respective spool numbers, in accordance with the marked up fabrication

Method Statement For Spool Fabrication Of Steel Piping Read More »