Latest from our website
-
Main Distribution Board MDB Testing & Commissioning Procedure
Read more: Main Distribution Board MDB Testing & Commissioning ProcedureUpon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is […]
-
Condensate Water Filter Installation Method Statement
Read more: Condensate Water Filter Installation Method StatementThe Condensate Water Filter (Side Stream/ Multimedia) are compact filtration packages for the removal of grit, airborne particles and scale from cooling tower water in order to avoid system fouling. A licensed and/or trained/experienced plant electrician and millwright-pipe fitter should install this packaged system. Ensure that the concrete pad is level and structurally sound to […]
-
Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves
Read more: Installation Method Statement for Crane Gem Rubber Lined Butterfly ValvesThese instructions relate only to Crane Gem rubber lined Butterfly valves, which are designed and manufactured to provide isolation, or can be used for regulation, of flow of suitable fluids. Valves must be installed into a well-designed system and it is recommended that the system be inspected in accordance with the appropriate member state legislation. […]
-
INSTALLATION, SETTING AND MAINTENANCE INSTRUCTIONS CRANE BALANCING VALVES
Read more: INSTALLATION, SETTING AND MAINTENANCE INSTRUCTIONS CRANE BALANCING VALVESSCOPE OF THIS DOCUMENT COVERS BELOW MENTIONED BALANCING VALVES: DM921 & DMG921 DOUBLE REGULATING VALVE (DRV) DM931 & DMG931 DA931 & DAG 931 VARIABLE ORIFICE DOUBLE REGULATING VALVE (VODRV) DM941 & DMG 941 DA941 & DAG941 FIXED ORIFICE DOUBLE REGULATING VALVE (FODRV) FITTING PRESSURE TEST VALVES The pressure test valve with the red tag should […]
-
General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines
Read more: General Instructions and Method Statement for Chemical Cleaning of Carbon Steel PipelinesFollowing is a precise chemical cleaning procedure that will ensure the internal and external cleanliness and protection of the pipes before the piping process unit is put into service. Scope of work covers all the horizontal and vertical pipelines through all the areas in the project and buried underground lines in the infrastructure area as […]
Document Categories
- Aluminium & Glass Work Methods (10)
- Building Management System (27)
- Civil Engineering Methods (165)
- Civil SWMS Downloads (36)
- Construction Method Statements (201)
- Download Method Statement (153)
- Duct Works (14)
- Electrical Downloads (45)
- Electrical Method Statements (97)
- Fire Fighting Downloads (9)
- Fire Suppression System (14)
- HVAC Downloads (43)
- HVAC Method Statements (101)
- Method Statement for Civil Works (120)
- Method Statements (380)
- Occupational Health and Safety (47)
- Piping Method Statements (33)
- Piping Works (33)
- Plumbing Downloads (26)
- Plumbing Method Statements (65)
- Pressure Testing (11)
- Preventive Maintenance (9)
- Project Planning (12)
- Pump Installation (4)
- Quality Management (44)
- Risk Assessment (27)
- Roadworks (22)
- Stainless Steel Fabrication (11)
- Technical Articles (64)
- Technical Calculations (3)
- Templates (25)
- Test Reports & Forms (13)
- Testing & Commissioning (102)
- Uncategorized (1)
Join other subscribers
Stay in the loop with everything you need to know.