Below is a brief method statement for road markings and road signs. The method will ensure the quality of work in accordance with the contract requirements and applicable local standards. Following this road work method statement will also ensure that all quality
Read Complete Method
	
					
	
							
			
		 
	
				
	Below asphalt paving method statement describes the responsibilities of personnel, execution procedure, safety factors and mandatory documents for the work. The overall responsibility lies with the project manager but specifically relevant function heads are responsible for controlling the asphalt paving work quality
Read Complete Method
	
					
	
							
			
		 
	
				
	Below is a brief paving method statement that is useful for interlocking blocks, interlocking bricks and interlocking tiles paving works. Following is list of necessary resources, equipment and tools for doing the block paving works. Theodolite/dumpy level leveling staff loader plate/roller compactor
Read Complete Method
	
					
	
							
			
		 
	
				
	What is Safety Hazard? In the field of occupational health and safety the word hazard is a little bit difficult to understand and explain since it is mixed with other terms like danger and risk. We can define hazard as a cause
Read Complete Method
	
					
	
							
			
		 
	
				
	The Bituseal Enamel is based on a specially selected bitumen, modified with high performance engineering polymers. This polymer modification ensures improvements of a number of the product’s qualities, e.g. flexibility, adhesion and durability. Bituseal Enamel is supplied in different types/grades, depending on
Read Complete Method
	
					
	
							
			
		 
	
				
	This safe work method statement outlines conventional safety requirements for erecting and dismantling the vertical concrete forming systems. However, equipment and forming systems differ for different manufacturers and suppliers. Therefore reference must always be made to the instructions and procedures of the