2022
Jul
9

Method Statement for Structured Cabling System Installation

Method Statement for Structured Cabling System Installation

This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any

2022
Jul
3

Sprinkler System Installation Procedure

Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss:

2022
Jun
28

Construction Project Quality Plan Basic Requirements & Template

Below are basic sections that can form a good project quality plan for construction sites. 1. Introduction Construction Quality Control Plan (CQCP) for any kind of project is implemented to ensure that construction procedures are performed in compliance with the plans and

2022
May
25

Manual Handling Manual Lifting Techniques and Safety Procedure

This health and safety procedure provides guidance and direction in identification of potential manual handing and lifting issues and prevention measures to help eliminate the risk of injury. Procedure addresses safety instructions for both projects and offices of the company, additional control

2022
May
8

Pressure Vessel Steel Tank Fabrication Welding General Steps

Pressure Vessel Steel Tank Fabrication Welding General Steps

Below method covers the erection of the tank by joining the top and bottom portion through the welding procedure. Prior to the commencement of the works the lifting supervisor must ensure that all site personnel are adequately briefed on the contents of

2022
Apr
14

General Civil Work Method Statement for Roads & Building Construction

Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout

2022
Feb
20

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method of Statement

This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible

error: Content is protected !!