Category Archives: Method Statement for Civil Works

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Hydro and Water Fill Up Test for Settling Tanks

This test procedure shall be carried out to detect the leak in shell weld joints and to observe the load stabilization of liquid in interval level height. During the hydro test, all instrumentation shall be excluded to avoid the damage to instruments. Since the hydro test is to be carried out by produced water, ensure… Read More »

Method Statement for Installation of Fencing

Following Plant & Equipment to be arranged for the project fencing work. Tracked excavator Tractor and trailer Post driver Chainsaw Small tools (hammers, nail guns, wire cutters etc.) All personnel entering the site shall have received site safety induction and have attended a job toolbox talk. The Fencing Site Engineer will issue a Permit to Dig… Read More »

Method Of Statement For Structural Excavation & Backfilling

Excavation and Backfilling for Culverts, Storm Sewers and Ducts Precast concrete and steel pipe culverts and pipe ducts will be installed in trenches cut into previously constructed and compacted embankment either from the subgrade or from an embankment height at least twice the nominal diameter of the pipe. Unless otherwise noted on the drawings, trenches… Read More »

Method Statement for Earthwork Related to Track Work

Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench mark and existing ground level (EGL) all these have to be confirmed by… Read More »

Construction Project Site Mobilization Method Statement

Project starts from project mobilization. Once you win the project and client asks you to move your team you need certain documents for submission and approval. Site mobilization method statement is one of such requirement. Now a days most of the government entities require that all contractors must submit a plan which details how mobilization… Read More »

Concrete Reinforcement Standard Requirements and Specifications

All reinforcement for use in the permanent works shall be specified on the drawings and shall comply with the Standards specified below. Deformed bars shall have Type 2 bond classification. BS or American Standards are applicable as mentioned but not limited to the following. BS 4449: Carbon Steel Bars for Reinforcement of Concrete BS 8666-2000, BS EN… Read More »