Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Epoxy Painting Method

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages during the execution of Epoxy Painting Works at project site. The equipment/tools involved in painting works are listed below. Paint Brushes/Roller Paint Sprayers as required […]

Epoxy Painting Method Read More »

Civil Works Method Statements

Download Method Statement for Fabrication & Installation of Tensile Fabric Shades

Download Method Statement for Fabrication & Installation Of Tensile Fabric Shades  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list

Download Method Statement for Fabrication & Installation of Tensile Fabric Shades Read More »

Civil Works Method Statements

Download Method Statement for Screeding Works

Download Method Statement for Screeding Works  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in

Download Method Statement for Screeding Works Read More »

Civil Works Method Statements

Download Method Statement for Installation of False Ceiling System

Download Method Statement for Installation Of False Ceiling System (Gypsum Boards, Panels Etc)  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the

Download Method Statement for Installation of False Ceiling System Read More »

Civil Works Method Statements

Method Statement for Excavation & Backfilling for Open Foundations / Footings

Below is a brief method statement that details general procedures to be followed for excavation & backfilling of foundations, Sub-structures & Trenches for any type of the construction and road project. The method covers survey works, excavation, backfilling, compaction and area cleaning after the completion of works. Separate work method statement, will be generated by

Method Statement for Excavation & Backfilling for Open Foundations / Footings Read More »

Civil Works Method Statements

Download Method Statement for Concrete Works Superstructure

Download Method Statement for Concrete Works  Download Package Contains the Method Statement + Checklists for Concrete Works + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included

Download Method Statement for Concrete Works Superstructure Read More »

Civil Works Method Statements

Download Method Statement for RCC Columns & Walls

Download Method Statement for RCC Columns & Walls  Download Package Contains the Method Statement + Checklists for RCC Columns & Walls+ Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of

Download Method Statement for RCC Columns & Walls Read More »

Civil Works Method Statements
error: Content is protected !!
Scroll to Top