2018
Jun
22

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at

2018
Feb
16

Design of Reaction System for 1500 mm diameter Test Pile

The following are the main elements in the design of reaction system for 1500 mm diameter test pile.     Design of Reaction Anchor.     Design of Dywidag Bars.     Design of cross beam.   Anchor Design The test load

2018
Feb
9

Method Statement for Temporary Retaining Wall Installation

Temporary-Retaining-Wall-Installation-Method-Statement

The existing ground level varies between + 3.52 m DMD to + 4.29 m DMD. The working platform level for Double U wall is considered at the average ground level. A Double U channel beam wall with one layer of tie-back anchors

2018
Jan
15

Method Statement for Pile Reinforcement and Concrete Casting

Piling Cage Installation

Subsequent to the completion of the pile drilling, the borehole depth will be checked and verified versus the depth given on daily piling sequence and pile data.  Only after borehole depth check can the cage be lowered into the borehole.  A reference

2018
Jan
7

Method Statement for Piling Works Constructions – Drilling

Below is a brief method statement of piling work that can be used for any kind of project piling works. A crawler mounted piling rig will be used to install bored cast in situ piles of dia 1200 mm. The procedure for

2016
May
11

Download Method Statement For Internal Painting Works

Download Method Statement For Internal Painting Works  Download Package Contains the Method Statement + Checklists for Painting + Inspection & Testing Plan + Risk Assessment  You only need to change project name and insert logos etc and the same shall be ready to be submitted for

2016
May
11

Internal Painting Method Statement

This method statement details general procedures to be followed for the internal painting work using paints from Berger at any kind of a project/building. The procedure covers preparatory works, actual application and area cleaning associated with the painting works. For Latex Emulsion