Web Master

Quality Management Procedure for Business Development – Sample

Below is a complete management procedure for business development, that can be used for any company by making little modifications. The procedure provides a basic structure for more inclusions depending upon the business type. Mostly marketing or business development departments are the owner of this procedure, both departments are working collectively to achieve the business […]

Quality Management Procedure for Business Development – Sample Read More »

Quality & Project Management
Mast Climber Installation Method statement

Method Statement for Assembling Erection Installation & Management of Mast Climber

The Scope of this method statement covers all operations and associated activities involved in safe and efficient management of Mast Climber including assembling, erection, and installation for efficient and effective utilization in execution of project works. Following equipment shall be arranged: Tower crane Flat bed Lorries Safety harnesses, Helmet Chain blocks, power tools as required

Method Statement for Assembling Erection Installation & Management of Mast Climber Read More »

Civil Works Method Statements, Occupational Health and Safety
Temporary Works Standard Safety Procedure

Temporary Works Standard Safety Procedure

The purpose of this procedure is to provide safework instruction for the safe erection, dismantling and structure design of temporary works. Definitions and Abbreviations Temporary Works: Any temporary structure required to construct a permanent structure or used to support a permanent structure. TWC: Temporary Works Coordinator TWD: Temporary Works Designer TWDC: Temporary Works Design Checker

Temporary Works Standard Safety Procedure Read More »

Occupational Health and Safety
Traffic Light Installation Method Statement

Traffic Light Installation Method Statement

This method statement is helpful to understand how the new traffic light junction can be installed by a contractor. This procedure will define the method to be used to ensure that the traffic light system is installed correctly and acceptable and shall conform to the contract documents and project specifications. Project Manager shall ensure overall

Traffic Light Installation Method Statement Read More »

Electrical Method Statements

Download Method Statement For Testing & Commissioning of H2S Scrubbers System

This method statement covers the testing, pre-commissioning, commissioning, functional verification, performance testing, and final acceptance of Hâ‚‚S scrubber systems. The scope includes all associated mechanical, process, piping, instrumentation, electrical, control, and SCADA systems. Applicable Systems Download Package Contains: You only need to change project name, insert logos and the same shall be ready to be

Download Method Statement For Testing & Commissioning of H2S Scrubbers System Read More »

HVAC Method Statements, Testing & Commissioning

Download Method Statement for Coring & Cutting of RCC Walls

Download Method Statement for Coring & Cutting Of RCC Walls  Download Package Contains the Method Statement + Checklists for Cutting + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of

Download Method Statement for Coring & Cutting of RCC Walls Read More »

Civil Works Method Statements
error: Content is protected !!
Scroll to Top